نظرة عامة

هندسة مرة واحدة، نشر متعدد.

A mobile broadcast trailer (also known as an outside broadcast or OB van) is a road-deployable broadcast production facility for live event coverage — sports broadcasts, news events, concerts, political summits, and entertainment productions. structmod mobile broadcast trailers integrate the production control room, technical infrastructure (cameras, audio, video switching, graphics), satellite or fibre uplink for transmission to the broadcast network, and operator workspace into a single road-deployable unit. The trailer drives between event venues and sets up for broadcast within hours of arrival.

Standard configurations include the production control room with director's position, vision mixing, audio mixing, graphics workstation, and engineering monitoring; equipment racks housing broadcast servers, video switching matrix, audio infrastructure, encoders, and uplink electronics; satellite uplink dish (deployable mast or fixed roof-mount) or fibre/IP transmission infrastructure for broadcast network connection; cable management for outside connections to cameras, audio sources, and venue infrastructure; operator workspace with seating for production team during broadcasts. Acoustic isolation prevents external venue noise from affecting production audio; air conditioning maintains equipment temperature during sustained operation; redundant power systems (mains plus generator backup) prevent transmission interruption.

structmod mobile broadcast trailers serve sports broadcasters covering football, basketball, motorsport and other live sports across multiple venues per week; news broadcasters covering political events, breaking news, and major announcements; entertainment broadcasters covering concerts, festivals, and award shows; corporate broadcasters covering major announcements and stakeholder events. The trailer-based configuration enables broadcasters to maintain consistent production quality across different venues without relying on venue infrastructure. Lead time is 14-18 weeks from contract signature for stock configurations, 16-20 weeks for specialty configurations including 4K UHD or specialty audio infrastructure. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical with broadcast-grade earthing, EMI/EMC compliance for sensitive electronics.

تسلسل النشر النموذجي

  1. الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
  2. الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
  3. الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
  4. الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
  5. الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
  6. الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
المواصفات التقنية

Spec sheet — STR-2424

الطول الكلي14.4 m · 47.2 ft
العرض (أثناء النقل)2.55 م
العرض (بعد الفرد)5.00 m
الارتفاع (أثناء النقل)2.70 m
مساحة الأرضية (بعد الفرد)72.0 m²
الوزن الفارغ12.4 t
الهيكلفولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2
جودة اللحامEN ISO 3834-3
الغلافلوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن)
مقاومة الحريقEI-30 · مُختبر وفق EN 13501-2
الأرضيةخشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10
الكهرباء230 فولت / 50 هرتز · TN-S · مطابق IEC 60364
التكييف والتهويةمضخة حرارية Split Inverter · MERV-8
نطاق التشغيل−25 °م إلى +50 °م (محيط)
مقاومة الرياحمُصمَّم لرياح أساسية 130 كم/س (EN 1991-1-4)
النقلبصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية)
زمن التجهيز2–4 ساعات · طاقم شخصين

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

منتجات ذات صلة

المزيد من المقطورات المتنقلة

تواصل عبر واتساب