A mobile command and control trailer is a road-deployable tactical operations center (TOC) configured for rapid command and control deployment in military operations or civil emergency response. structmod mobile command and control trailers integrate the situation room with operational picture displays, communications infrastructure (multi-band radio, secure data, satellite uplink), workstations for staff functions, and supporting infrastructure into a single trailer that drives to the operational site and establishes command capability within hours. The trailer-based configuration supports the modern operational tempo where command facilities must move with the operational picture.

Standard configurations include the situation room with large-format displays for the common operational picture (COP), planning workstations with map walls and information management infrastructure, communications operator positions with multi-band radio and secure data terminals, command office for the commander and key staff, and supporting workspaces (intelligence, fires, logistics, personnel staff). C4ISR integration includes pre-installed cable trays for communications wiring, dedicated power circuits with EMI/EMC protection, grounding/bonding to military electrical standards, and provisions for satellite uplink antenna deployment. Rapid setup time and reconfiguration flexibility are primary design drivers — the trailer must be operational within 30-60 minutes of arrival at site for tactical use cases.

structmod mobile command and control trailers serve tactical military operations (Army, Marine Corps, Air Force tactical command), special operations forces requiring rapid forward command capability, civil emergency response (fire and rescue services, civil protection agencies running incident command at major events), homeland security operations (border security, counter-terrorism response), and joint operations where multi-service command coordination is required. Lead time is 12-14 weeks from contract signature for stock configurations, 14-18 weeks for security-classified configurations including TEMPEST shielding. NATO CAGE registration, STANAG-compliant interface specifications, optional CBRN protection per STANAG 4447.

تسلسل النشر النموذجي

  1. الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
  2. الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
  3. الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
  4. الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
  5. الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
  6. الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
المواصفات التقنية

Spec sheet — STR-3378

الطول الكلي13.8 m · 45.3 ft
العرض (أثناء النقل)2.99 م
العرض (بعد الفرد)2.99 م
الارتفاع (أثناء النقل)2.70 m
مساحة الأرضية (بعد الفرد)41.3 m²
الوزن الفارغ12.8 t
الهيكلفولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2
جودة اللحامEN ISO 3834-3
الغلافلوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن)
مقاومة الحريقEI-30 · مُختبر وفق EN 13501-2
الأرضيةخشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10
الكهرباء230 فولت / 50 هرتز · TN-S · مطابق IEC 60364
التكييف والتهويةمضخة حرارية Split Inverter · MERV-8
نطاق التشغيل−25 °م إلى +50 °م (محيط)
مقاومة الرياحمُصمَّم لرياح أساسية 130 كم/س (EN 1991-1-4)
النقلبصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية)
زمن التجهيز5 ساعات · طاقم شخصين