هندسة مرة واحدة، نشر متعدد.
A mobile movie set trailer is a road-deployable film and television production facility configured for on-location shooting — make-up and hair, wardrobe and costume, green room and talent rest, director's suite, and production infrastructure in a single trailer that travels with the production to filming locations. structmod mobile movie set trailers serve film production companies on location shoots requiring consistent production infrastructure at multiple filming locations, television series production filming across multiple venues per week, commercial and advertising production at multiple client locations, and documentary/reality television production filming in challenging locations.
Standard configurations include the make-up and hair bay (with lighted mirror stations, counter space, styling infrastructure, climate control appropriate for extended make-up work), wardrobe and costume bay (with hanging storage, iron/steamer stations, tailoring workspace, shoe storage), green room (with comfortable seating for cast waiting between scenes, refreshments, entertainment), director's suite (with video playback, editing station, privacy for creative decisions), production office (with paperwork workspace, call sheet distribution, production coordination), and supporting infrastructure (washrooms, minimal kitchenette for catering coordination, climate control throughout, power distribution for make-up lighting and styling equipment).
structmod mobile movie set trailers serve film and television production across major productions — feature film on-location shoots (particularly for scenes requiring multiple takes with extended make-up setup), episodic television filming at multiple recurring locations, commercial and advertising production at client facility locations, music video production at outdoor or location sites, and documentary/reality production requiring production infrastructure at filming sites. Lead time is 10-12 weeks from contract signature. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical with appropriate capacity for make-up lighting (typical 32A circuits per make-up station), DOT/E-mark vehicle homologation.
تسلسل النشر النموذجي
- الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
- الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
- الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
- الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
- الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
- الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
Spec sheet — STR-2398
| الطول الكلي | 15.8 m · 51.8 ft |
|---|---|
| العرض (أثناء النقل) | 2.55 م |
| العرض (بعد الفرد) | 5.00 m |
| الارتفاع (أثناء النقل) | 3.10 m |
| مساحة الأرضية (بعد الفرد) | 79.0 m² |
| الوزن الفارغ | 13.8 t |
| الهيكل | فولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2 |
| جودة اللحام | EN ISO 3834-3 |
| الغلاف | لوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن) |
| مقاومة الحريق | EI-30 · مُختبر وفق EN 13501-2 |
| الأرضية | خشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10 |
| الكهرباء | 400 فولت / 50 هرتز · ثلاثي الطور · مطابق IEC 60364 |
| التكييف والتهوية | VRF متعدد الانقسام · HEPA H13 (طبية) |
| نطاق التشغيل | −25 °م إلى +50 °م (محيط) |
| مقاومة الرياح | مُصمَّم لرياح أساسية 140 كم/س (EN 1991-1-4) |
| النقل | بصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية) |
| زمن التجهيز | 5 ساعات · طاقم شخصين |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.