نظرة عامة

هندسة مرة واحدة، نشر متعدد.

A mobile stage trailer is a road-deployable performance stage that converts from transport configuration to show-ready stage through hydraulic deployment. structmod mobile stage trailers serve festival operators running summer touring festivals, concert promoters covering multi-city tours, political campaign operators needing stages at rally sites, religious and community event organisers, and corporate event operators running major announcements with performance elements. The trailer-based configuration delivers professional-grade stage infrastructure with road mobility — one trailer serves 10-30+ events per season across the festival circuit.

Standard configurations include the stage floor (typical 50-80 m² deployed stage surface, scaling to 100+ m² for larger configurations), hydraulic stage roof with lighting truss integration, side stage wings for speaker arrays and lighting fixtures, rigging points for hanging lighting, video walls and audio equipment, stage access stairs and wheelchair ramp for performer accessibility, and front-of-stage barrier infrastructure for crowd separation. Sound system integration includes line array speaker mounting points, monitor mixing position, and FOH (front of house) mixing position typically positioned 20-40 m from the stage in the audience area. Lighting includes front-wash lighting, back-wash lighting, moving head fixtures for effect work, and DMX control infrastructure.

structmod mobile stage trailers serve the live entertainment industry where road-deployable performance stages follow the event circuit — summer music festivals covering multiple festival weekends, concert tours covering 15-30 cities per tour, political rallies with multiple campaign stops, religious revivals and community events, and corporate event programmes including performance elements. Lead time is 12-14 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis with appropriate structural design for live loads (performer weight, equipment weight, wind and snow loads), hydraulic stage deployment per Machinery Directive 2006/42/EC, rigging per Entertainment Industry (Rigging) standards.

تسلسل النشر النموذجي

  1. الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
  2. الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
  3. الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
  4. الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
  5. الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
  6. الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
المواصفات التقنية

Spec sheet — STR-3155

الطول الكلي15.5 m · 50.9 ft
العرض (أثناء النقل)2.99 م
العرض (بعد الفرد)2.99 م
الارتفاع (أثناء النقل)3.20 m
مساحة الأرضية (بعد الفرد)46.3 m²
الوزن الفارغ14.5 t
الهيكلفولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2
جودة اللحامEN ISO 3834-3
الغلافلوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن)
مقاومة الحريقEI-30 · مُختبر وفق EN 13501-2
الأرضيةخشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10
الكهرباء120/240 فولت · 60 هرتز (مواصفات أمريكية) · مطابق IEC 60364
التكييف والتهويةوحدة سقفية متكاملة · MERV-13
نطاق التشغيل−25 °م إلى +50 °م (محيط)
مقاومة الرياحمُصمَّم لرياح أساسية 150 كم/س (EN 1991-1-4)
النقلبصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية)
زمن التجهيزساعتان · طاقم شخصين

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

منتجات ذات صلة

المزيد من المقطورات المتنقلة

تواصل عبر واتساب