نظرة عامة

هندسة مرة واحدة، نشر متعدد.

A mobile training trailer is a road-deployable training and certification facility configured for industrial, vocational, professional or military training programmes at the workplace or field site. structmod mobile training trailers serve industrial safety training programmes (mining, oil & gas, construction, manufacturing) delivering certification at worksites, military training units conducting specialty courses at operating bases, professional certification programmes (medical, technical, regulatory) reaching practitioners at their locations, and vocational training programmes extending trade education to remote areas.

Standard configurations include classroom/theory space (typical 30-45 m² for 15-25 trainees with teacher position, whiteboard or smartboard, student seating in theatre or classroom layout), simulator/practical space (configured for the specific training topic — equipment simulator, procedure practice area, specialty training apparatus), instructor's workspace with course materials and assessment infrastructure, printer and paperwork area for certification documentation, and supporting infrastructure (climate control, appropriate lighting for training activities, washroom, kitchenette for breaks). Specialty configurations include welding training booths, vehicle operator simulators, medical procedure practice rooms, mining safety simulators, and other topic-specific training infrastructure.

structmod mobile training trailers serve organisations where on-site training delivery matters — reducing the overhead of trainee travel to central training centres, maintaining workforce availability by training on-site, and ensuring training relevance by delivering it in the working environment. Common use cases: mining safety certification campaigns visiting multiple sites annually, manufacturing compliance training across multi-site industrial operators, military specialty training reaching deployed units, professional continuing education for medical, engineering or technical practitioners. Lead time is 10-12 weeks from contract signature. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical, specialty equipment integration per training topic.

تسلسل النشر النموذجي

  1. الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
  2. الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
  3. الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
  4. الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
  5. الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
  6. الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
المواصفات التقنية

Spec sheet — STR-2337

الطول الكلي13.7 m · 44.9 ft
العرض (أثناء النقل)2.55 م
العرض (بعد الفرد)7.50 m
الارتفاع (أثناء النقل)3.00 م
مساحة الأرضية (بعد الفرد)102.8 m²
الوزن الفارغ15.7 t
الهيكلفولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2
جودة اللحامEN ISO 3834-3
الغلافلوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن)
مقاومة الحريقEI-30 · مُختبر وفق EN 13501-2
الأرضيةخشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10
الكهرباء230 فولت / 50 هرتز · TN-S · مطابق IEC 60364
التكييف والتهويةمضخة حرارية Split Inverter · MERV-8
نطاق التشغيل−25 °م إلى +50 °م (محيط)
مقاومة الرياحمُصمَّم لرياح أساسية 130 كم/س (EN 1991-1-4)
النقلبصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية)
زمن التجهيز4 ساعات · طاقم شخصين

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

منتجات ذات صلة

المزيد من المقطورات المتنقلة

تواصل عبر واتساب