هندسة مرة واحدة، نشر متعدد.
A modular school unit is a permanent-installation educational building assembled from prefabricated modules — complete classrooms with finishes, MEP services and educational fittings already installed in the factory. structmod modular school units serve education ministries building rapid-deployment school infrastructure (especially in growing populations or post-disaster reconstruction), education NGOs establishing schools in underserved areas, school districts adding capacity to existing campuses, and private school networks opening new locations. The 8-12 week turnkey delivery compresses the conventional 12-24 month school construction timeline — important for September openings, post-disaster education continuity, and refugee education programmes.
Standard configurations include classroom modules sized to local educational standards (typically 60-80 m² per classroom for 25-32 students), corridor and stair circulation, washroom modules sized to student count and age group, administration spaces (head teacher office, staff room, reception), library or learning resource space, and supporting infrastructure. Specialty configurations extend to science laboratories (with fume hoods, gas, water, eyewash, safety shower), computer/IT labs (with high-density power and structured cabling), arts and crafts spaces, music rooms with acoustic isolation, and physical education facilities with appropriate ceiling height. Energy performance follows destination-country standards (Title 24 California, EPC UK, BEP Türkiye) with high-performance envelope and HVAC.
structmod modular school units serve education ministries across developing and emerging markets where rapid school construction is a strategic priority, post-conflict reconstruction programmes restoring education infrastructure, and refugee/displaced-population education programmes (UNHCR, UNICEF, education NGOs). Compliance includes destination-country building code, fire safety and life safety per the appropriate national standard, accessibility per ADA equivalent, and educational facility standards from the relevant ministry. Lead time is 8-12 weeks from contract signature for stock configurations, 12-16 weeks for customised configurations including specialty learning spaces. Design life matches conventional school construction at 50+ years.
تسلسل النشر النموذجي
- اليوم 1 — التحقق من أساس الموقع، تركيب الأرجل الملولبة أو الأساسات الشريطية
- اليوم 2–3 — رفع الوحدات إلى مواقعها بواسطة رافعة متنقلة
- اليوم 3–4 — توصيل الوحدات وإحكام الغلاف
- اليوم 4–5 — توصيلات MEP، الاختبارات الرطبة
- اليوم 5–6 — التشطيب الداخلي، تركيب التجهيزات والمعدات
- اليوم 7 — التشغيل، تقرير FAT، تدريب المستخدمين والتسليم
Spec sheet — STR-1942
| الطول الكلي | 14.2 m · 46.6 ft |
|---|---|
| العرض (أثناء النقل) | 2.99 م |
| العرض (بعد الفرد) | 2.99 م |
| الارتفاع (أثناء النقل) | 3.10 m |
| مساحة الأرضية (بعد الفرد) | 42.5 m² |
| الوزن الفارغ | 16.2 t |
| الهيكل | فولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2 |
| جودة اللحام | EN ISO 3834-3 |
| الغلاف | لوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن) |
| مقاومة الحريق | EI-30 · مُختبر وفق EN 13501-2 |
| الأرضية | خشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10 |
| الكهرباء | 400 فولت / 50 هرتز · ثلاثي الطور · مطابق IEC 60364 |
| التكييف والتهوية | VRF متعدد الانقسام · HEPA H13 (طبية) |
| نطاق التشغيل | −25 °م إلى +50 °م (محيط) |
| مقاومة الرياح | مُصمَّم لرياح أساسية 140 كم/س (EN 1991-1-4) |
| التصميم الزلزالي | وفق EN 1998-1 (يوروكود 8) · فئة مطيلية DCM |
| النقل | بصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية) |
| زمن التجهيز | 4 ساعات · طاقم شخصين |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.