هندسة مرة واحدة، نشر متعدد.
A project-based expandable trailer is a custom-engineered pop-out trailer designed around a specific operational need — hydraulic pop-out configuration, specialised interior fit-out, equipment integration, and regulatory environment — rather than drawn from a catalogue. structmod design-build delivery for expandable trailers begins with the operating organisation's brief (target operation, deployed footprint requirement, interior functional needs, equipment list, regulatory framework) and ends with a commissioned expandable unit ready for operational use. Custom expandable trailers serve operations where catalogue expandable products don't match the specific need — specialty clinical configurations beyond standard medical trailers, specialty laboratory or research configurations, specialty command and control configurations, and unique operational requirements.
Typical custom expandable project briefs include: specialty clinical trailers (specific single-disease clinics, rare specialty consultation, bespoke research site trailers), specialty laboratory configurations (unique equipment integration, specific clean room requirements, specialty BSL or high-containment work), specialty command and control configurations (specific communications architecture, unique intelligence integration, national doctrine-specific workflow), and unique operational requirements (specialty broadcasting, specialty entertainment production, bespoke industrial applications). Design begins with an operational workshop where requirements work through before detail engineering.
structmod project-based expandable trailers serve operators across specialty niches — specialty medical programmes requiring bespoke clinical configuration, research organisations running specialty field campaigns, defence forces requiring mission-specific expandable capability, and specialty industrial operators requiring expandable working environments. Lead time is 16-22 weeks from contract signature for typical custom projects — longer than catalogue due to expandable engineering complexity. Hydraulic deployment per Machinery Directive 2006/42/EC, EN 1090 EXC-2 chassis, IEC 60364-1 commercial or IEC 60364-7-710 medical electrical per application, and any operation-specific regulatory framework.
تسلسل النشر النموذجي
- الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
- الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
- الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
- الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
- الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
- الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
Spec sheet — STR-3204
| الطول الكلي | 12.4 m · 40.7 ft |
|---|---|
| العرض (أثناء النقل) | 2.55 م |
| العرض (بعد الفرد) | 5.00 m |
| الارتفاع (أثناء النقل) | 2.70 m |
| مساحة الأرضية (بعد الفرد) | 62.0 m² |
| الوزن الفارغ | 9.4 t |
| الهيكل | فولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2 |
| جودة اللحام | EN ISO 3834-3 |
| الغلاف | لوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن) |
| مقاومة الحريق | EI-30 · مُختبر وفق EN 13501-2 |
| الأرضية | خشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10 |
| الكهرباء | 230 فولت / 50 هرتز · TN-S · مطابق IEC 60364 |
| التكييف والتهوية | مضخة حرارية Split Inverter · MERV-8 |
| نطاق التشغيل | −25 °م إلى +50 °م (محيط) |
| مقاومة الرياح | مُصمَّم لرياح أساسية 130 كم/س (EN 1991-1-4) |
| النقل | بصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية) |
| زمن التجهيز | 2–4 ساعات · طاقم شخصين |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.