نظرة عامة

هندسة مرة واحدة، نشر متعدد.

A project-based medical trailer is a custom-engineered mobile medical unit designed around a specific clinical programme — clinical specialty, equipment integration, geographical deployment context, regulatory framework — rather than drawn from a catalogue. structmod design-build delivery for medical trailers begins with the operating organisation's clinical brief (target patient population, clinical pathway, equipment list, regulatory environment) and ends with a commissioned mobile unit ready for clinical use. Custom medical trailers serve clinical programmes where catalogue products don't match the specific need: specialty consultation services, niche diagnostic capabilities, rare disease screening, research protocol delivery, and specialised clinical research operations.

Typical custom project briefs include: specialty single-disease clinics (diabetes specialist clinic, heart failure clinic, COPD clinic), rare disease diagnostic capability (combining genetic testing, specialty imaging, multi-specialist consultation), clinical research delivery (study site infrastructure for clinical trials, pharmacokinetic sampling, controlled-environment study procedures), equipment-specific integration (specific OEM platform integration where catalogue trailers don't match), and unique regulatory contexts (specific national regulatory requirements, religious or cultural workflow adaptations, military-specific requirements). Design begins with a clinical workshop where structmod engineering, the operating clinical team, and any specialist consultants work through requirements before detail engineering begins.

structmod project-based medical trailers serve operators across healthcare niches — specialty pharmaceutical companies running clinical trial site networks, specialty disease management organisations (oncology, cardiology, diabetes specialty providers), national rare disease programmes establishing diagnostic capability across regions, research institutions running multi-site clinical research, and specialty private healthcare operators delivering distinctive clinical services. Lead time is 14-20 weeks from contract signature for typical custom projects, longer for complex configurations with extensive equipment integration. Compliance includes destination-country medical device regulation, IEC 60364-7-710 medical electrical, and any clinical-programme-specific regulatory framework.

تسلسل النشر النموذجي

  1. الساعة 0 — وصول المقطورة على مركبة السحب، التمركز والتثبيت
  2. الساعة 0–1 — فرد أرجل التثبيت والتحقق من التسوية
  3. الساعة 1–2 — فرد الجدران الهيدروليكية أو التوسعات حيث مثبتة
  4. الساعة 2–3 — توصيل المرافق (طاقة، مياه، صرف)
  5. الساعة 3–4 — الاختبار الوظيفي وفق بروتوكول FAT
  6. الساعة 4 — التسليم التشغيلي مع تدريب المستخدمين
المواصفات التقنية

Spec sheet — STR-2879

الطول الكلي15.9 m · 52.2 ft
العرض (أثناء النقل)2.99 م
العرض (بعد الفرد)2.99 م
الارتفاع (أثناء النقل)3.20 m
مساحة الأرضية (بعد الفرد)47.5 m²
الوزن الفارغ17.9 t
الهيكلفولاذ مُدرفل على الساخن EN 10025 S355JR · EN 1090 EXC-2
جودة اللحامEN ISO 3834-3
الغلافلوح ساندويتش، نواة PIR 80 مم · λ ≈ 0.023 واط/(م·كلفن)
مقاومة الحريقEI-30 · مُختبر وفق EN 13501-2
الأرضيةخشب رقائقي بحري على EPDM · تصنيف مقاومة انزلاق R-10
الكهرباء120/240 فولت · 60 هرتز (مواصفات أمريكية) · مطابق IEC 60364
التكييف والتهويةوحدة سقفية متكاملة · MERV-13
نطاق التشغيل−25 °م إلى +50 °م (محيط)
مقاومة الرياحمُصمَّم لرياح أساسية 150 كم/س (EN 1991-1-4)
النقلبصمة ISO 668 · مؤهّل للوحة CSC (الإصدارات الحاوية)
زمن التجهيز2–4 ساعات · طاقم شخصين

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

منتجات ذات صلة

More from healthcare

تواصل عبر واتساب