Engineered once, deployable many times.
An emergency field hospital is a rapidly deployable medical facility engineered to restore healthcare capacity within 72 hours of a disaster, epidemic or mass casualty event. structmod emergency field hospitals are built around expandable trailers and container modules that arrive pre-wired, pre-plumbed and functionally tested — so your clinical team walks into a working hospital on day one, not a construction site.
Each emergency field hospital ships with its own power, water, HVAC, medical gas and waste systems, making it fully self-sufficient on arrival. Configurations range from 20-bed primary-care units for remote disaster zones up to 100-bed facilities with damage-control surgery, ICU, imaging and laboratory — all scalable by linking additional modules through shared corridors. For larger surge events, two or more 100-bed units combine into 200-300 bed complexes without additional engineering.
structmod works with health ministries, disaster-relief agencies, NATO-aligned defence forces and UN agencies to specify, manufacture and pre-position emergency field hospitals worldwide. Units can be flown in by C-130 / C-17 aircraft, transported by sea or towed to site, then deployed by a 4-6 person crew with minimal site preparation. Every emergency field hospital meets WHO EMT Type 1 or Type 2 minimum standards and carries full EN 1090 structural certification.
Secuencia de despliegue típica
- Horas 0–2 — unidades de remolque o contenedor llegan al emplazamiento
- Horas 2–6 — posicionamiento, nivelación y conexión entre unidades
- Horas 6–12 — sellado de envolvente, conexión MEP, gas médico
- Horas 12–24 — instalación de equipos, puesta en marcha, FAT
- Horas 24–72 — formación de usuarios, entrega operacional
Spec sheet — STR-2433
| Longitud total | 15.3 m · 50.2 ft |
|---|---|
| Anchura (transporte) | 2,99 m |
| Anchura (desplegado) | 2,99 m |
| Altura (transporte) | 3,00 m |
| Superficie (desplegado) | 45.7 m² |
| Peso en seco | 12.3 t |
| Chasis | Acero laminado en caliente EN 10025 S355JR · EN 1090 |
| Calidad de soldadura | EN ISO 3834-2 · coordinador de soldadura certificado (IWE) |
| Envolvente | Panel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K) |
| Resistencia al fuego | EI-30 · ensayado según EN 13501-2 |
| Suelo | Contrachapado marino sobre EPDM · clasificación antideslizante R-10 |
| Instalación eléctrica | 230 V / 50 Hz · TN-S · conforme IEC 60364 |
| Climatización | Bomba de calor inverter split · MERV-8 |
| Rango de operación | −25 °C a +50 °C ambiente |
| Clasificación de viento | Diseñado para viento básico de 130 km/h (EN 1991-1-4) |
| Diseño sísmico | Según EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM |
| Transporte | Huella ISO 668 · apto para placa CSC (variantes contenedor) |
| Tiempo de montaje | 24–72 horas · equipo de 4–6 personas |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.