RESUMEN

Engineered once, deployable many times.

An expandable hospital trailer is a road-deployable hospital module that combines ward beds, triage capability and basic diagnostics in a single trailer unit, with hydraulic pop-out walls expanding the operational floor area to 60-90 m². structmod expandable hospital trailers couple together through shared inter-trailer corridors to form complete field hospital configurations — single trailer for outpost-level care, 4-6 trailer cluster for company-level field hospital, 8-12 trailer cluster for battalion-level Role 2 capability.

Standard configurations include a 4-6 bed ward area with patient monitoring at each bed, triage position at the trailer entrance for clinical screening, treatment bay for stabilisation and minor procedures, basic diagnostic capability (point-of-care lab, x-ray or ultrasound, ECG), nursing station and clean/dirty utility, and supporting clinical infrastructure. Multiple trailers couple through airtight vestibules with environmental conditioning across the full coupled footprint, supporting clinical workflow continuity between specialised trailer functions (one trailer for triage, another for surgery, another for ICU, another for ward).

structmod expandable hospital trailers serve military forward medical units, humanitarian disaster response teams, mass-casualty surge capability for civil emergency services, and regional hospital surge capacity during pandemic or crisis. The trailer-based configuration deploys faster than modular field hospital construction (days vs weeks) and is fully road-mobile for relocation as the operational picture changes. Lead time is 12-16 weeks from contract signature for stock configurations, 14-18 weeks for specialty configurations including ICU, surgical capability, or specific medical equipment integration.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2757

Longitud total15.7 m · 51.5 ft
Anchura (transporte)2,55 m
Anchura (desplegado)7.50 m
Altura (transporte)3,00 m
Superficie (desplegado)117.8 m²
Peso en seco12.7 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje4 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.