Engineered once, deployable many times.
A military field hospital is the clinical cornerstone of the forward operating base, providing surgical, resuscitative and holding capacity within the combat zone. structmod military field hospitals exceed standard Role 2 configurations with hardened envelope construction, collective CBRN filtration, ballistic protection options and secure-communications-ready IT rooms — engineered for operations in contested environments where threat levels extend beyond those faced by humanitarian field hospitals.
Standard military field hospital configurations include emergency triage with mass-casualty surge capacity, damage-control surgical suites, intensive care, inpatient holding wards, diagnostic imaging, clinical laboratory, pharmacy, CSSD, blood bank and morgue. CBRN-resilient variants add collective protection overpressure systems, air filtration to STANAG 4447 levels, and personnel decontamination lines. Ballistic-rated envelope packages are available for Level III/IV protection where threat assessment requires.
structmod works with NATO member defence ministries, allied nations and defence primes to specify military field hospitals for expeditionary missions, peacekeeping operations and national-defence forward medical capability. Every unit carries NATO CAGE registration, passes AMedP-1.6 evaluation criteria, and ships with complete technical documentation including environmental qualification reports, EMI/EMC compliance, and CBRN test certificates.
Secuencia de despliegue típica
- Horas 0–2 — unidades de remolque o contenedor llegan al emplazamiento
- Horas 2–6 — posicionamiento, nivelación y conexión entre unidades
- Horas 6–12 — sellado de envolvente, conexión MEP, gas médico
- Horas 12–24 — instalación de equipos, puesta en marcha, FAT
- Horas 24–72 — formación de usuarios, entrega operacional
Spec sheet — STR-2349
| Longitud total | 14.9 m · 48.9 ft |
|---|---|
| Anchura (transporte) | 2,99 m |
| Anchura (desplegado) | 2,99 m |
| Altura (transporte) | 3,00 m |
| Superficie (desplegado) | 44.6 m² |
| Peso en seco | 9.9 t |
| Chasis | Acero laminado en caliente EN 10025 S355JR · EN 1090 |
| Calidad de soldadura | EN ISO 3834-2 · coordinador de soldadura certificado (IWE) |
| Envolvente | Panel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K) |
| Resistencia al fuego | EI-30 · ensayado según EN 13501-2 |
| Suelo | Contrachapado marino sobre EPDM · clasificación antideslizante R-10 |
| Instalación eléctrica | 230 V / 50 Hz · TN-S · conforme IEC 60364 |
| Climatización | Bomba de calor inverter split · MERV-8 |
| Rango de operación | −25 °C a +50 °C ambiente |
| Clasificación de viento | Diseñado para viento básico de 130 km/h (EN 1991-1-4) |
| Diseño sísmico | Según EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM |
| Transporte | Huella ISO 668 · apto para placa CSC (variantes contenedor) |
| Tiempo de montaje | 24–72 horas · equipo de 4–6 personas |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.