RESUMEN

Engineered once, deployable many times.

A mobile accommodation trailer is a road-deployable sleeping accommodation unit configured with bedrooms, en-suite bathrooms, and supporting infrastructure for sustained occupancy by workforce, military or humanitarian personnel. structmod mobile accommodation trailers serve mining and oil & gas operators establishing exploration camps quickly, defence forces accommodating personnel during exercises or deployments, construction project camps requiring rapid mobilisation, and humanitarian deployments housing relief workforces. The road-deployable configuration arrives at site ready to occupy — no on-site construction, no foundation works, just utility connection and orientation briefing.

Standard configurations include 2-4 bedroom variants per trailer, each with attached bathroom (shower, toilet, basin), built-in storage, work desk space, and individual HVAC for occupant comfort. Bedroom configurations follow the operating organisation's accommodation policy — single-occupancy rooms for managers and supervisors, twin-occupancy for skilled trades, four-bed shared rooms for trade workers or military personnel. Inter-trailer corridors link multiple accommodation trailers into camp-scale configurations, with shared communal facilities (dining, recreation, laundry) provided by adjacent specialty trailers. Each trailer connects to camp-level utilities (electrical mains, water supply, sewer or septic, communications) through standardised interface points.

structmod mobile accommodation trailers serve workforce camps where road-deployable sleeping accommodation matters — exploration mining camps following the geological campaign across multiple sites, oil & gas exploration teams rotating between drilling locations, construction project camps following the project's geographical phasing, defence forces deploying for time-limited exercises or operations, and humanitarian disaster response teams housing relief crews during the response window. Lead time is 8-10 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis, DOT/E-mark vehicle homologation, IEC 60364-1 commercial electrical, and accommodation building code compliance per destination country.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2851

Longitud total13.1 m · 43.0 ft
Anchura (transporte)2,55 m
Anchura (desplegado)7.50 m
Altura (transporte)2.80 m
Superficie (desplegado)98.3 m²
Peso en seco16.1 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica400 V / 50 Hz · trifásico · conforme IEC 60364
ClimatizaciónVRF multi-split · HEPA H13 (médica)
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 140 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje3 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.