RESUMEN

Engineered once, deployable many times.

A mobile command and control trailer is a road-deployable tactical operations center (TOC) configured for rapid command and control deployment in military operations or civil emergency response. structmod mobile command and control trailers integrate the situation room with operational picture displays, communications infrastructure (multi-band radio, secure data, satellite uplink), workstations for staff functions, and supporting infrastructure into a single trailer that drives to the operational site and establishes command capability within hours. The trailer-based configuration supports the modern operational tempo where command facilities must move with the operational picture.

Standard configurations include the situation room with large-format displays for the common operational picture (COP), planning workstations with map walls and information management infrastructure, communications operator positions with multi-band radio and secure data terminals, command office for the commander and key staff, and supporting workspaces (intelligence, fires, logistics, personnel staff). C4ISR integration includes pre-installed cable trays for communications wiring, dedicated power circuits with EMI/EMC protection, grounding/bonding to military electrical standards, and provisions for satellite uplink antenna deployment. Rapid setup time and reconfiguration flexibility are primary design drivers — the trailer must be operational within 30-60 minutes of arrival at site for tactical use cases.

structmod mobile command and control trailers serve tactical military operations (Army, Marine Corps, Air Force tactical command), special operations forces requiring rapid forward command capability, civil emergency response (fire and rescue services, civil protection agencies running incident command at major events), homeland security operations (border security, counter-terrorism response), and joint operations where multi-service command coordination is required. Lead time is 12-14 weeks from contract signature for stock configurations, 14-18 weeks for security-classified configurations including TEMPEST shielding. NATO CAGE registration, STANAG-compliant interface specifications, optional CBRN protection per STANAG 4447.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-3378

Longitud total13.8 m · 45.3 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2.70 m
Superficie (desplegado)41.3 m²
Peso en seco12.8 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

More from military & defense

WhatsApp ile sohbet