Engineered once, deployable many times.
A mobile dialysis trailer brings haemodialysis capability to patient populations outside fixed renal unit catchments — rural areas with no local dialysis access, disaster response for patients with established renal failure, prison healthcare, workforce medical support in remote camps, and surge capacity during renal unit refurbishment. structmod mobile dialysis trailers accommodate 4-6 dialysis stations in parallel treatment workflow, with the water treatment and concentrate supply infrastructure that makes clinical dialysis possible — reverse osmosis plant, central bicarbonate supply, per-station acid concentrate, and dialysate distribution system.
Water treatment is the heart of a dialysis unit and the first engineering challenge on a mobile platform. structmod trailers integrate a full reverse osmosis water treatment plant dimensioned for the dialysis machine demand, with pre-filtration, softening, RO permeation, post-RO UV treatment, and delivery loop to each dialysis station. Water quality monitoring includes conductivity, chlorine, hardness, and microbiological surveillance per AAMI/ISO 23500 and EN 13959 standards. Central bicarbonate and acid concentrate supply feeds each station through a dedicated concentrate loop, eliminating the need for jug-at-machine concentrate handling and supporting reliable clinical dosing.
structmod mobile dialysis trailers serve national renal programmes running rural dialysis access, international development partners (WHO, UNHCR) supporting refugee populations with pre-existing renal failure, private renal care operators, and disaster response teams managing patients with chronic kidney disease in crisis settings. Lead time is 10-14 weeks from contract signature. Clinical commissioning includes water quality validation (AAMI/ISO 23500), machine-specific performance testing, and patient safety verification before first treatment.
Secuencia de despliegue típica
- Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
- Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
- Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
- Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
- Hora 3–4 — prueba funcional según protocolo FAT
- Hora 4 — entrega operacional con formación de usuarios
Spec sheet — STR-2343
| Longitud total | 14.3 m · 46.9 ft |
|---|---|
| Anchura (transporte) | 2,99 m |
| Anchura (desplegado) | 2,99 m |
| Altura (transporte) | 3,00 m |
| Superficie (desplegado) | 42.8 m² |
| Peso en seco | 12.3 t |
| Chasis | Acero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2 |
| Calidad de soldadura | EN ISO 3834-3 |
| Envolvente | Panel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K) |
| Resistencia al fuego | EI-30 · ensayado según EN 13501-2 |
| Suelo | Contrachapado marino sobre EPDM · clasificación antideslizante R-10 |
| Instalación eléctrica | 230 V / 50 Hz · TN-S · conforme IEC 60364 |
| Climatización | Bomba de calor inverter split · MERV-8 |
| Rango de operación | −25 °C a +50 °C ambiente |
| Clasificación de viento | Diseñado para viento básico de 130 km/h (EN 1991-1-4) |
| Transporte | Huella ISO 668 · apto para placa CSC (variantes contenedor) |
| Tiempo de montaje | 5 horas · equipo de 2 personas |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.