RESUMEN

Engineered once, deployable many times.

A mobile drone station trailer is a road-deployable unmanned aircraft system (UAS) operations base configured with the ground control station, maintenance bay, mission planning workspace, and launch/recovery infrastructure required for sustained UAS operations. structmod mobile drone station trailers serve tactical military intelligence, surveillance and reconnaissance (ISR) units operating Class I-II UAS, border security forces running mobile surveillance, commercial drone services performing inspections or mapping at multiple sites, and emergency response teams using UAS for situational awareness during disaster response.

Standard configurations include the ground control station (GCS) with operator workstations, mission planning displays, video downlink processing, command-and-control radio infrastructure; maintenance bay with workshop infrastructure for the operating UAS family, parts storage, and battery charging or fuel storage; mission planning room for pre-flight briefings, route planning, and post-flight intelligence exploitation; aircrew rest area for sustained operations; secure data processing space for downlinked intelligence products. Launch and recovery infrastructure varies by UAS type — runway access for fixed-wing, vertical takeoff zone for rotary-wing or VTOL, catapult mounting for catapult-launched systems. The trailer-based configuration enables UAS operations at sites without permanent UAS infrastructure.

structmod mobile drone station trailers serve defence ISR units operating Class I (small UAS) through Class II (medium UAS) systems with mobile operational tempo, border security forces running long-endurance surveillance from temporary forward positions, commercial drone services (mapping, inspection, agriculture) operating at multiple client sites per week, emergency response teams using UAS for disaster site assessment, and academic/research institutions running field UAS research programmes. Lead time is 10-14 weeks from contract signature for stock configurations, 12-16 weeks for security-classified configurations. NATO CAGE registered for defence procurement; commercial-grade configurations available for civil aviation use cases.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2828

Longitud total14.8 m · 48.6 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2,90 m
Superficie (desplegado)44.3 m²
Peso en seco11.8 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.