RESUMEN

Engineered once, deployable many times.

A mobile mammography trailer brings breast cancer screening to communities without easy access to fixed screening centres — rural populations, underserved urban populations, corporate workforce health programmes, and national screening programme coverage beyond the fixed centre network. structmod mobile mammography trailers integrate digital mammography (optional with tomosynthesis / 3D imaging), lead-shielded imaging room, technician console, patient waiting area and private changing cubicles into a road-legal semi-trailer that drives to site, sets up in 2-4 hours, and images 40-80 patients per clinical day.

The clinical workflow through the trailer follows screening programme protocols. Patients arrive at reception, complete any required documentation, wait in the seating area, enter the private changing cubicle for preparation, proceed to the imaging room for the mammography examination (typically 10-15 minutes with two-view bilateral imaging), and exit through the post-examination area. Digital image capture eliminates film handling; images transfer via secure network to the central screening reading centre for radiologist reporting. Tomosynthesis (digital breast tomosynthesis, DBT) adds 3D imaging capability recommended by many screening programmes for dense breast tissue — this is specified as an imaging-system upgrade at procurement.

structmod mobile mammography trailers serve national cancer screening programmes (the UK NHS Breast Screening Programme, Turkey Kanser Tarama Programı, similar programmes across Europe and the Gulf), regional cancer centres running outreach, corporate health programmes, and NGO-led awareness campaigns. Lead time is 10-14 weeks from contract signature. Lead shielding specification follows NCRP Report 147 for mammography workloads; mammography-specific radiation safety (IEC 60601-2-45) and EU Medical Exposures Directive compliance are validated at commissioning.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-3334

Longitud total13.4 m · 44.0 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)3.10 m
Superficie (desplegado)40.1 m²
Peso en seco13.4 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica400 V / 50 Hz · trifásico · conforme IEC 60364
ClimatizaciónVRF multi-split · HEPA H13 (médica)
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 140 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje2–4 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.