RESUMEN

Engineered once, deployable many times.

A mobile medical imaging trailer combines multiple imaging modalities into a single road-deployable unit — typically ultrasound, x-ray and DEXA bone densitometry sharing the trailer's clinical workflow. structmod mobile medical imaging trailers serve health screening programmes that benefit from multiple imaging modalities at the same patient visit (typical women's health screening combines ultrasound, mammography and bone density), outreach programmes covering rural populations with limited fixed imaging access, and corporate health screening combining cardiovascular, musculoskeletal and metabolic imaging in one visit.

Standard configurations organise the trailer with separate imaging rooms for each modality — ultrasound room (typical 8-10 m² with examination table and ultrasound machine), x-ray room with appropriate lead shielding per NCRP Report 147 (typical 10-12 m² with digital radiography system), DEXA bone densitometry room (typical 8-10 m² with low-dose imaging system requiring minimal shielding), shared patient flow areas (changing cubicles, waiting), and operator console area with PACS workstations. Multi-modality patient flow allows comprehensive screening during a single visit — typically 30-45 minutes for a complete screening session through all three modalities.

structmod mobile medical imaging trailers serve workforce health screening programmes (corporate health programmes, defence forces periodic medical examinations), women's health screening programmes (combining breast, gynaecological and bone density assessment), age-related screening programmes (osteoporosis, cardiovascular, mobility assessment in elderly populations), and rural healthcare programmes extending diagnostic imaging coverage. Lead time is 12-16 weeks from contract signature. Compliance includes IEC 60601-2-45 mammography (where included), NCRP Report 147 shielding for x-ray, IEC 60601-2-37 ultrasound, IEC 60601-1 medical electrical safety.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2973

Longitud total13.3 m · 43.6 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)3,00 m
Superficie (desplegado)39.8 m²
Peso en seco12.3 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

More from healthcare

WhatsApp ile sohbet