RESUMEN

Engineered once, deployable many times.

A mobile operating room trailer brings a fully-equipped surgical theatre to sites where permanent operating infrastructure is absent, inadequate or temporarily unavailable. structmod mobile operating room trailers are engineered to the same clinical standard as a fixed operating theatre: HEPA H13 filtration with laminar flow over the sterile field, medical-gas reticulation per ISO 9170, IEC 60364-7-710 medical electrical with isolated power and UPS backup, and surgical lighting per IEC 60601-2-41. What changes is the platform — the trailer chassis enables road deployment to any site that a semi-trailer can reach.

The standard configuration includes the operating theatre (20-22 m² sterile field), anaesthesia workstation with gas scavenging, scrub sink bay at the theatre entrance, clean-zone preparation area, dirty-zone instrument return, and a 1-2 bed recovery bay. Pressure cascades maintain cleanliness: positive pressure in the theatre, negative pressure in the dirty return zone. Surgical equipment integrates to hospital standards — anaesthesia machine, surgical lights, ceiling pendants for equipment support, integrated monitoring. Operating theatre environment can be certified to UK HBN 26-01 equivalent or ISO 14644 class 7 ultra-clean standard depending on surgical scope.

structmod mobile operating room trailers support field hospitals in disaster and conflict response, outreach surgical missions (cataract, hernia, cleft palate programmes), hospital surgical capacity during infrastructure renovation, and mobile military forward surgical capability. Lead time is 10-14 weeks from contract signature for stock configuration; specialty surgical requirements (cardiac, neurosurgical, orthopaedic) extend to 14-18 weeks due to equipment integration complexity. Full surgical commissioning, microbiological air sampling, and clinical validation testing are included in the handover package.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2936

Longitud total13.6 m · 44.6 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2,90 m
Superficie (desplegado)40.7 m²
Peso en seco11.6 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje3 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

More from healthcare

WhatsApp ile sohbet