RESUMEN

Engineered once, deployable many times.

A mobile stage trailer is a road-deployable performance stage that converts from transport configuration to show-ready stage through hydraulic deployment. structmod mobile stage trailers serve festival operators running summer touring festivals, concert promoters covering multi-city tours, political campaign operators needing stages at rally sites, religious and community event organisers, and corporate event operators running major announcements with performance elements. The trailer-based configuration delivers professional-grade stage infrastructure with road mobility — one trailer serves 10-30+ events per season across the festival circuit.

Standard configurations include the stage floor (typical 50-80 m² deployed stage surface, scaling to 100+ m² for larger configurations), hydraulic stage roof with lighting truss integration, side stage wings for speaker arrays and lighting fixtures, rigging points for hanging lighting, video walls and audio equipment, stage access stairs and wheelchair ramp for performer accessibility, and front-of-stage barrier infrastructure for crowd separation. Sound system integration includes line array speaker mounting points, monitor mixing position, and FOH (front of house) mixing position typically positioned 20-40 m from the stage in the audience area. Lighting includes front-wash lighting, back-wash lighting, moving head fixtures for effect work, and DMX control infrastructure.

structmod mobile stage trailers serve the live entertainment industry where road-deployable performance stages follow the event circuit — summer music festivals covering multiple festival weekends, concert tours covering 15-30 cities per tour, political rallies with multiple campaign stops, religious revivals and community events, and corporate event programmes including performance elements. Lead time is 12-14 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis with appropriate structural design for live loads (performer weight, equipment weight, wind and snow loads), hydraulic stage deployment per Machinery Directive 2006/42/EC, rigging per Entertainment Industry (Rigging) standards.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-3155

Longitud total15.5 m · 50.9 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)3.20 m
Superficie (desplegado)46.3 m²
Peso en seco14.5 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje2 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

Más remolques móviles

WhatsApp ile sohbet