Engineered once, deployable many times.
A modular medical clinic is a permanent-installation healthcare building assembled from volumetric prefabricated modules — complete rooms with finishes, MEP services and clinical fittings already installed in the factory. structmod modular medical clinics deliver primary-care, specialist outpatient or community-clinic capability with the design life and clinical performance of a conventional building, but with the construction schedule of a manufactured product. Site foundation works and module production run in parallel; modules arrive plumbed, wired and finished; on-site assembly takes days; commissioning takes weeks; the clinic opens in a fraction of conventional construction time.
Standard configurations include 2-6 examination rooms, consultation offices, a treatment bay for procedures, a clinical room for nursing and dressings, a phlebotomy or sample collection point, a small clinical laboratory, a pharmacy dispensary, reception and waiting area, staff rooms and washrooms, and patient washrooms. The modular grid allows specialty extensions — adding a dental wing, a women's health wing, a paediatric wing, or a minor surgery suite — by adding additional modules to the same architectural language. Infection control, MEP zoning, finishes and accessibility all match the brief of a national health ministry community clinic standard.
structmod modular medical clinics serve health ministries building rapid-deployment community health infrastructure, NGOs establishing semi-permanent primary care presence in underserved areas, mining and oil & gas operators establishing site clinics for workforce healthcare, and private healthcare chains opening new outpatient centres. Lead time is 8-14 weeks from contract signature for stock configurations, 12-18 weeks for customised clinical programmes. EN 1090 EXC-2 structural steel, IEC 60364-7-710 medical electrical, and destination-country building code compliance ensure regulatory readiness for permanent installation.
Secuencia de despliegue típica
- Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
- Días 2–3 — módulos elevados a posición con grúa móvil
- Días 3–4 — conexiones entre módulos y sellado de envolvente
- Días 4–5 — conexiones MEP, pruebas húmedas
- Días 5–6 — acabados interiores, instalación de accesorios y equipos
- Día 7 — puesta en marcha, informe FAT, formación y entrega
Spec sheet — STR-2747
| Longitud total | 14.7 m · 48.2 ft |
|---|---|
| Anchura (transporte) | 2,99 m |
| Anchura (desplegado) | 2,99 m |
| Altura (transporte) | 3.20 m |
| Superficie (desplegado) | 44.0 m² |
| Peso en seco | 11.7 t |
| Chasis | Acero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2 |
| Calidad de soldadura | EN ISO 3834-3 |
| Envolvente | Panel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K) |
| Resistencia al fuego | EI-30 · ensayado según EN 13501-2 |
| Suelo | Contrachapado marino sobre EPDM · clasificación antideslizante R-10 |
| Instalación eléctrica | 120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364 |
| Climatización | Unidad compacta de cubierta · MERV-13 |
| Rango de operación | −25 °C a +50 °C ambiente |
| Clasificación de viento | Diseñado para viento básico de 150 km/h (EN 1991-1-4) |
| Diseño sísmico | Según EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM |
| Transporte | Huella ISO 668 · apto para placa CSC (variantes contenedor) |
| Tiempo de montaje | 4 horas · equipo de 2 personas |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.