RESUMEN

Engineered once, deployable many times.

A modular container shower is a workforce ablution facility built into a transport-compatible container chassis with shower stations, hot water generation, HVAC and ventilation infrastructure pre-installed. structmod modular container showers ship in standard ISO 668 footprint (20-ft or 40-ft) — sea-freight compatible, road transport on standard tractors, deployable in 4-8 hours by a small crew. Inside, 8 to 24 individual shower cubicles plus drying area, lockers and ancillary infrastructure deliver the bathing capacity that workforce camps and event sites require.

Standard configurations organise the shower block as parallel cubicle banks with central drying area: 8-station configuration in 20-ft container (4 cubicles per side), 16-station in 40-ft container (8 per side), 24-station in extended-length configuration. Each shower cubicle includes dedicated thermostatic shower mixer, individual lighting, soap and shampoo dispenser mounting, towel hook, and effective drainage. Hot water is generated by central plant (gas or electric water heater sized to peak shower demand — typically 200-500 L tank capacity), with circulation loops to maintain water temperature at fixtures. Ventilation extracts moisture from shower zone (typical 15-20 air changes per hour) preventing mould growth and maintaining indoor air quality.

structmod modular container showers serve mining and oil & gas workforce camps (typically 1 shower station per 8-12 occupants), construction project camps, defence forces (peacekeeping bases, training establishments), large events (festivals, sporting events, political summits), and humanitarian deployments (refugee camps, disaster response, displaced population settlements). Lead time is 8-10 weeks from contract signature. EN 1090 EXC-2 structural, IEC 60364-7-701 medical electrical for shower installation safety, water connection per destination-country plumbing code, and waste water management per environmental regulations.

Secuencia de despliegue típica

  1. Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
  2. Días 2–3 — módulos elevados a posición con grúa móvil
  3. Días 3–4 — conexiones entre módulos y sellado de envolvente
  4. Días 4–5 — conexiones MEP, pruebas húmedas
  5. Días 5–6 — acabados interiores, instalación de accesorios y equipos
  6. Día 7 — puesta en marcha, informe FAT, formación y entrega
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2473

Longitud total15.3 m · 50.2 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2.80 m
Superficie (desplegado)45.7 m²
Peso en seco16.3 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica400 V / 50 Hz · trifásico · conforme IEC 60364
ClimatizaciónVRF multi-split · HEPA H13 (médica)
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 140 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.