RESUMEN

Engineered once, deployable many times.

A modular dental clinic is a permanent-installation dental practice assembled from prefabricated modules with full clinical fittings, MEP services and dental infrastructure already installed. structmod modular dental clinics scale from 2-chair primary care dental practices through to 10+ chair specialty clinics with implant suites, oral surgery facilities and full prosthetic laboratories. The modular construction approach delivers the dental practice in 8-14 weeks turnkey, compared to 6-12 months for conventional construction — important for new practice openings, dental chain expansion programmes, and replacement of obsolete dental facilities.

Each dental chair in the clinic comes pre-installed with chairside infrastructure: dental delivery unit, suction, compressed air, water supply (mains and bottled water for critical procedures), overhead operatory light, x-ray sensor or film workflow, and chairside instrument storage. Central infrastructure includes the sterilisation suite (linear dirty-to-clean workflow with ultrasonic cleaning, autoclave, packaging), centralised dental compressor and suction units in the mechanical room, panoramic and cephalometric x-ray, dental laboratory for chairside prosthetics and minor lab work, and reception/waiting flow management. Larger configurations add cone-beam CT, sedation suite, oral surgery theatre and recovery, and specialty workflow zones.

structmod modular dental clinics serve dental practice chains opening new locations, dental schools establishing teaching clinics, military dental services standing up garrison dental support, corporate occupational dental programmes, and humanitarian dental services in semi-permanent deployment. Lead time is 8-14 weeks from contract signature for stock 4-chair configurations, 14-20 weeks for larger or specialty configurations. Compliance includes IEC 60364-7-710 medical electrical, infection control workflow per HTM 01-05 (UK) or equivalent national standard, and dental practice regulation compliance per destination country.

Secuencia de despliegue típica

  1. Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
  2. Días 2–3 — módulos elevados a posición con grúa móvil
  3. Días 3–4 — conexiones entre módulos y sellado de envolvente
  4. Días 4–5 — conexiones MEP, pruebas húmedas
  5. Días 5–6 — acabados interiores, instalación de accesorios y equipos
  6. Día 7 — puesta en marcha, informe FAT, formación y entrega
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2104

Longitud total14.4 m · 47.2 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)3.10 m
Superficie (desplegado)43.1 m²
Peso en seco16.4 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica400 V / 50 Hz · trifásico · conforme IEC 60364
ClimatizaciónVRF multi-split · HEPA H13 (médica)
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 140 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje2–7 días en obra

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

More from healthcare

WhatsApp ile sohbet