RESUMEN

Engineered once, deployable many times.

A modular luxury room is a 5-star hotel suite delivered as a complete factory-finished volumetric module with the premium FFE specification, materials and finishes that luxury hospitality brands demand. structmod modular luxury rooms serve resort developers building premium properties on tight timelines, boutique hotel brands expanding portfolios, urban luxury hotel projects on constrained sites, and corporate-owned executive accommodation. The modular construction approach delivers the same luxury room finish as conventional construction at significantly faster build cadence — increasingly accepted by luxury brands as the construction method matures.

Luxury room specifications include premium materials (natural stone in bathrooms, hardwood furniture, premium fabrics, designer lighting), Italian or German bathroom fittings (Hansgrohe, Grohe, Villeroy & Boch, Duravit, Geberit), king-size beds with premium mattresses and linen, smart room controls (lighting scenes, climate, blackout blinds, entertainment, room service ordering), high-quality glazing with blackout capability and acoustic performance, and bespoke artwork and signature touches per the brand identity. Room dimensions typically scale up from standard hotel modules — 4-5 m wide × 8-10 m long × 3-3.5 m high accommodating king bed, sitting area, large en-suite bathroom with separate bathtub and shower, wardrobe area, and premium work/entertainment area.

structmod modular luxury rooms support luxury hotel and resort development globally — the increasing acceptance of modular construction by luxury brands (Four Seasons, Mandarin Oriental, Aman, Six Senses, Bulgari, premium Marriott and Hilton brands) reflects the demonstrated quality achievable through factory production. Lead time is 14-18 weeks from contract signature for production at scale; bespoke design elements add 4-8 weeks. All luxury room projects are quoted per specification after brand brief review and FFE selection.

Secuencia de despliegue típica

  1. Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
  2. Días 2–3 — módulos elevados a posición con grúa móvil
  3. Días 3–4 — conexiones entre módulos y sellado de envolvente
  4. Días 4–5 — conexiones MEP, pruebas húmedas
  5. Días 5–6 — acabados interiores, instalación de accesorios y equipos
  6. Día 7 — puesta en marcha, informe FAT, formación y entrega
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-1988

Longitud total14.8 m · 48.6 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2,90 m
Superficie (desplegado)44.3 m²
Peso en seco17.8 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.