RESUMEN

Engineered once, deployable many times.

A modular mammography clinic is a permanent breast screening facility built from prefabricated modules with the imaging rooms, lead shielding, image reading workstations, patient changing cubicles, counselling rooms and reception flow already integrated. structmod modular mammography clinics serve national breast cancer screening programmes building or expanding fixed screening capacity, hospital breast units replacing legacy mammography infrastructure, regional cancer centres establishing dedicated breast imaging capability, and private healthcare operators building breast screening services. The 10-14 week turnkey delivery accelerates screening programme rollout.

Standard configurations include 1-2 mammography rooms (lead-shielded per NCRP Report 147 with workload-adjusted shielding calculation), patient changing cubicles with secure storage, examination room for clinical breast examination, image reading room with PACS workstations and reporting infrastructure, counselling room for results communication and onward referral, reception and waiting area, and supporting clinical and administrative spaces. Tomosynthesis capability (digital breast tomosynthesis, DBT) is supported with the same shielding package; ultrasound rooms for diagnostic follow-up and stereotactic biopsy capability are added as configuration options for larger breast units.

structmod modular mammography clinics support national screening programmes (UK NHS Breast Screening Programme, Turkey Kanser Tarama Programı, similar programmes across Europe and the Gulf), regional cancer programmes building screening infrastructure, university hospital breast units, and private breast care providers. Lead time is 10-14 weeks from contract signature for stock configurations, 12-16 weeks for larger configurations including diagnostic and biopsy capability. Compliance includes IEC 60601-2-45 mammography equipment safety, NCRP Report 147 shielding, and EU Medical Exposures Directive.

Secuencia de despliegue típica

  1. Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
  2. Días 2–3 — módulos elevados a posición con grúa móvil
  3. Días 3–4 — conexiones entre módulos y sellado de envolvente
  4. Días 4–5 — conexiones MEP, pruebas húmedas
  5. Días 5–6 — acabados interiores, instalación de accesorios y equipos
  6. Día 7 — puesta en marcha, informe FAT, formación y entrega
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2658

Longitud total13.8 m · 45.3 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2.70 m
Superficie (desplegado)41.3 m²
Peso en seco12.8 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.