RESUMEN

Engineered once, deployable many times.

A modular multi-clinic is a permanent multi-specialty outpatient clinic — combining primary care, specialty consultation rooms, diagnostic services and supporting clinical infrastructure in a single integrated facility. structmod modular multi-clinics serve as community polyclinics, district health centres or specialty consultation hubs — delivering broad clinical capability close to the patient population without the cost and complexity of a full hospital build. The modular construction approach delivers a 6-12 specialty multi-clinic in 12-16 weeks turnkey, compared to 12-24 months for conventional polyclinic construction.

Standard configurations organise the clinic around a shared central core (reception, waiting, records, pharmacy, basic diagnostics) with specialty consultation wings radiating outward. Typical specialty mix includes general practice (4-8 examination rooms), women's health (gynaecology, antenatal, family planning), paediatric (well-child, immunisation, sick child), dental (2-4 chairs), ophthalmology (examination, refraction, minor procedures), ENT (consultation, audiology), dermatology (consultation, minor procedures), mental health (consultation, counselling), and physiotherapy (treatment area, exercise space). Diagnostic services include x-ray, ultrasound, ECG, point-of-care laboratory, and pharmacy dispensing.

structmod modular multi-clinics deliver to national health ministries building community health infrastructure (the WHO Astana Declaration's primary healthcare model), to district hospital networks extending outpatient capacity to underserved areas, to private healthcare chains opening community polyclinics, and to large employers providing comprehensive workforce healthcare. Lead time is 12-16 weeks from contract signature for stock 6-specialty configurations, 14-18 weeks for larger or customised configurations. Compliance covers IEC 60364-7-710 medical electrical, infection control per national standard, and ministry-of-health departmental requirements per destination country.

Secuencia de despliegue típica

  1. Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
  2. Días 2–3 — módulos elevados a posición con grúa móvil
  3. Días 3–4 — conexiones entre módulos y sellado de envolvente
  4. Días 4–5 — conexiones MEP, pruebas húmedas
  5. Días 5–6 — acabados interiores, instalación de accesorios y equipos
  6. Día 7 — puesta en marcha, informe FAT, formación y entrega
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2027

Longitud total14.7 m · 48.2 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)3.20 m
Superficie (desplegado)44.0 m²
Peso en seco11.7 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje4 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.