Engineered once, deployable many times.
A modular office building is a permanent commercial workspace assembled from prefabricated modules with the office layouts, MEP services, IT infrastructure and finishes already installed in the factory. structmod modular office buildings serve corporate clients expanding workspace on constrained timelines, mining and oil & gas operators establishing administration buildings at remote sites, technology companies opening new development centres, government agencies extending office space without extended construction disruption, and developers building speculative or pre-leased commercial space.
Standard configurations include open-plan workspace zones (typically 8-12 m² per workstation including circulation), enclosed offices for managers and executives, meeting rooms in mixed sizes (4-person huddle through 12-person boardroom), focus rooms and phone booths for concentrated work, kitchen and breakout areas for staff respite, washrooms sized to occupancy, server room with appropriate cooling and security for IT infrastructure, reception and visitor management area, and supporting circulation. Multi-storey stackable configurations extend office capacity vertically — typical 2-4 storey configurations integrate lift, stair core and curtain-wall facade for full commercial-grade presentation.
structmod modular office buildings serve corporates growing across multiple locations who want consistent workspace quality, commercial real estate developers building speculative office space, public sector agencies extending office capacity for service delivery, and remote-site operators (mining, oil & gas, infrastructure projects) establishing administrative buildings. Lead time is 10-14 weeks from contract signature for single-storey stock configurations, 14-18 weeks for multi-storey stackable configurations. EN 1090 EXC-2 structural steel, EN 1998-1 + TBDY 2019 seismic compliance, IEC 60364-1 commercial electrical, and destination-country building code compliance support permanent commercial installation.
Secuencia de despliegue típica
- Día 1 — cimentación del emplazamiento verificada, gatos de tornillo o zapatas corridas colocados
- Días 2–3 — módulos elevados a posición con grúa móvil
- Días 3–4 — conexiones entre módulos y sellado de envolvente
- Días 4–5 — conexiones MEP, pruebas húmedas
- Días 5–6 — acabados interiores, instalación de accesorios y equipos
- Día 7 — puesta en marcha, informe FAT, formación y entrega
Spec sheet — STR-1421
| Longitud total | 14.1 m · 46.3 ft |
|---|---|
| Anchura (transporte) | 2,99 m |
| Anchura (desplegado) | 2,99 m |
| Altura (transporte) | 3.20 m |
| Superficie (desplegado) | 42.2 m² |
| Peso en seco | 17.1 t |
| Chasis | Acero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2 |
| Calidad de soldadura | EN ISO 3834-3 |
| Envolvente | Panel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K) |
| Resistencia al fuego | EI-30 · ensayado según EN 13501-2 |
| Suelo | Contrachapado marino sobre EPDM · clasificación antideslizante R-10 |
| Instalación eléctrica | 120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364 |
| Climatización | Unidad compacta de cubierta · MERV-13 |
| Rango de operación | −25 °C a +50 °C ambiente |
| Clasificación de viento | Diseñado para viento básico de 150 km/h (EN 1991-1-4) |
| Diseño sísmico | Según EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM |
| Transporte | Huella ISO 668 · apto para placa CSC (variantes contenedor) |
| Tiempo de montaje | 3 horas · equipo de 2 personas |
Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.