RESUMEN

Engineered once, deployable many times.

A multi-storey modular commercial building is a 2-4 storey office, retail or mixed-use building assembled from volumetric modules that stack on an EN 1090 structural steel frame. structmod multi-storey commercial units integrate the lift shaft, stair core, curtain-wall facade and services risers into the modular system — so what ships from the factory is not individual rooms but a complete vertical building, ready to operate once the modules are connected and the site interfaces are closed.

The structural steel frame is site-erected first, forming the skeleton that supports the modules and accommodates the vertical circulation cores. Modules — offices, meeting rooms, retail units, washroom blocks — slot into the frame in planned sequence, typically one floor per day for a 2,000-4,000 m² footprint. The curtain-wall system installs in parallel, providing weather closure before internal fit-out begins. Mechanical and electrical risers in the core connect to horizontal distribution pre-installed in each module, minimising on-site MEP work.

structmod multi-storey commercial buildings deliver to clients who need commercial real estate on a construction schedule that conventional building cannot match — typically 8-12 months from contract to operational handover versus 18-30 months for conventional construction. Applications include corporate headquarters expansion, retail anchors in new developments, mixed-use ground-retail-office blocks, and flagship buildings for organisations that need a premium commercial presence without the conventional construction timeline. Seismic design follows Eurocode 8 with TBDY 2019 compliance for Turkish projects; other national codes apply per destination country.

Secuencia de despliegue típica

  1. Mes 1 — preparación del emplazamiento, obras de cimentación, zanjas de servicios
  2. Meses 2–3 — erección de la estructura de acero principal (EN 1090)
  3. Meses 3–5 — cierre de envolvente, cubierta, muro cortina
  4. Meses 5–7 — preinstalación MEP, gas médico, alimentación de emergencia
  5. Meses 7–10 — equipamiento interior, instalación de equipos
  6. Meses 10–12 — puesta en marcha, FAT/SAT, formación de usuarios
  7. Mes 12 — entrega clínica con dossier completo de O&M
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-2868

Longitud total14.8 m · 48.6 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2.70 m
Superficie (desplegado)44.3 m²
Peso en seco15.8 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090
Calidad de soldaduraEN ISO 3834-2 · coordinador de soldadura certificado (IWE)
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje5 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.