RESUMEN

Engineered once, deployable many times.

A project-based expandable trailer is a custom-engineered pop-out trailer designed around a specific operational need — hydraulic pop-out configuration, specialised interior fit-out, equipment integration, and regulatory environment — rather than drawn from a catalogue. structmod design-build delivery for expandable trailers begins with the operating organisation's brief (target operation, deployed footprint requirement, interior functional needs, equipment list, regulatory framework) and ends with a commissioned expandable unit ready for operational use. Custom expandable trailers serve operations where catalogue expandable products don't match the specific need — specialty clinical configurations beyond standard medical trailers, specialty laboratory or research configurations, specialty command and control configurations, and unique operational requirements.

Typical custom expandable project briefs include: specialty clinical trailers (specific single-disease clinics, rare specialty consultation, bespoke research site trailers), specialty laboratory configurations (unique equipment integration, specific clean room requirements, specialty BSL or high-containment work), specialty command and control configurations (specific communications architecture, unique intelligence integration, national doctrine-specific workflow), and unique operational requirements (specialty broadcasting, specialty entertainment production, bespoke industrial applications). Design begins with an operational workshop where requirements work through before detail engineering.

structmod project-based expandable trailers serve operators across specialty niches — specialty medical programmes requiring bespoke clinical configuration, research organisations running specialty field campaigns, defence forces requiring mission-specific expandable capability, and specialty industrial operators requiring expandable working environments. Lead time is 16-22 weeks from contract signature for typical custom projects — longer than catalogue due to expandable engineering complexity. Hydraulic deployment per Machinery Directive 2006/42/EC, EN 1090 EXC-2 chassis, IEC 60364-1 commercial or IEC 60364-7-710 medical electrical per application, and any operation-specific regulatory framework.

Secuencia de despliegue típica

  1. Hora 0 — el remolque llega en el vehículo tractor, se posiciona y calza
  2. Hora 0–1 — gatos estabilizadores desplegados, nivelación verificada
  3. Hora 1–2 — paredes hidráulicas o extensiones desplegadas donde aplique
  4. Hora 2–3 — conexiones de servicios (electricidad, agua, aguas residuales)
  5. Hora 3–4 — prueba funcional según protocolo FAT
  6. Hora 4 — entrega operacional con formación de usuarios
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-3204

Longitud total12.4 m · 40.7 ft
Anchura (transporte)2,55 m
Anchura (desplegado)5.00 m
Altura (transporte)2.70 m
Superficie (desplegado)62.0 m²
Peso en seco9.4 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090 EXC-2
Calidad de soldaduraEN ISO 3834-3
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica230 V / 50 Hz · TN-S · conforme IEC 60364
ClimatizaciónBomba de calor inverter split · MERV-8
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 130 km/h (EN 1991-1-4)
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje2–4 horas · equipo de 2 personas

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.

RELACIONADOS

Más remolques expansibles

WhatsApp ile sohbet