RESUMEN

Engineered once, deployable many times.

A project-based military modular solution is a custom-engineered modular facility or complex designed around a specific defense mission — forward operating base, training establishment, clinical capability, command and control centre, or specialised capability such as CBRN response or special operations support. structmod design-build for defense integrates all disciplines — architecture, structural, MEP, security engineering, communications, CBRN, ballistic protection where specified — into a single coordinated solution that addresses the operational mission rather than just providing a building.

Typical defense modular solutions include barracks and accommodation for 50-5,000 personnel with full life-support infrastructure (mess, ablutions, laundry, medical, recreation), headquarters buildings with classified-communications-ready operations rooms, clinical facilities from battalion aid stations through Role 2+ field hospitals to fixed-base garrison health centres, specialised capabilities (vehicle maintenance, weapons storage, simulator facilities, CBRN response centres), and training establishments (classrooms, simulators, accommodation for instructional cadres). Each solution is engineered to the client's operational doctrine and national defense standards.

structmod is NATO CAGE registered and works with NATO member defense ministries, allied nations' armed forces, UN peacekeeping procurement chains, and defense prime contractors. Project documentation includes compliance matrices against STANAG and AMedP references (STANAG 2345 MEDEVAC, STANAG 2560 medical evaluation, STANAG 4447 CBRN, AMedP-9.1 modular medical), national defense engineering standards, and security classification handling from unclassified through restricted. Delivery integrates with defense logistics chains — modules can be packed to MIL-STD transport specifications and deployed by military airlift, sea lift or ground transport.

Secuencia de despliegue típica

  1. Mes 1 — preparación del emplazamiento, obras de cimentación, zanjas de servicios
  2. Meses 2–3 — erección de la estructura de acero principal (EN 1090)
  3. Meses 3–5 — cierre de envolvente, cubierta, muro cortina
  4. Meses 5–7 — preinstalación MEP, gas médico, alimentación de emergencia
  5. Meses 7–10 — equipamiento interior, instalación de equipos
  6. Meses 10–12 — puesta en marcha, FAT/SAT, formación de usuarios
  7. Mes 12 — entrega clínica con dossier completo de O&M
ESPECIFICACIÓN TÉCNICA

Spec sheet — STR-3974

Longitud total13.4 m · 44.0 ft
Anchura (transporte)2,99 m
Anchura (desplegado)2,99 m
Altura (transporte)2,90 m
Superficie (desplegado)40.1 m²
Peso en seco14.4 t
ChasisAcero laminado en caliente EN 10025 S355JR · EN 1090
Calidad de soldaduraEN ISO 3834-2 · coordinador de soldadura certificado (IWE)
EnvolventePanel sándwich, núcleo PIR 80 mm · λ ≈ 0,023 W/(m·K)
Resistencia al fuegoEI-30 · ensayado según EN 13501-2
SueloContrachapado marino sobre EPDM · clasificación antideslizante R-10
Instalación eléctrica120/240 V · 60 Hz (especificación EE.UU.) · conforme IEC 60364
ClimatizaciónUnidad compacta de cubierta · MERV-13
Rango de operación−25 °C a +50 °C ambiente
Clasificación de vientoDiseñado para viento básico de 150 km/h (EN 1991-1-4)
Diseño sísmicoSegún EN 1998-1 (Eurocódigo 8) · clase de ductilidad DCM
TransporteHuella ISO 668 · apto para placa CSC (variantes contenedor)
Tiempo de montaje4–16 semanas en obra

Full drawings, calculation notes, DoP, O&M manual and FAT report included with every unit. Specs indicative — configurable to project requirements.