    <title>structmod — Modular &amp; Mobile Structure Engineering</title>
    <link>https://structmod.com</link>
    <description>Technical articles on modular building systems, field hospitals, mobile infrastructure and prefabricated structures.</description>
    <language>en-GB</language>
    <atom:link href="https://structmod.com/feed.xml" rel="self" type="application/rss+xml"/>
    <lastBuildDate>Fri, 09 May 2026 00:00:00 +0000</lastBuildDate>
    <item>
      <title>Modular Construction below −25 °C: What Actually Fails</title>
      <link>https://structmod.com/blog/cold-climate-modular</link>
      <guid isPermaLink="true">https://structmod.com/blog/cold-climate-modular</guid>
      <description>Thermal bridges, drain lines, start-up sequencing, and the real failure modes of modular buildings in extreme cold. Lessons from Nordic defence and Andean mining.</description>
      <pubDate>Mon, 14 Apr 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>EN 1090 Execution Classes — EXC Determination Guide</title>
      <link>https://structmod.com/blog/en-1090-exc-3-explained</link>
      <guid isPermaLink="true">https://structmod.com/blog/en-1090-exc-3-explained</guid>
      <description>EN 1090 defines four execution classes (EXC-1 to EXC-4) for structural steelwork. EXC is derived from Consequence Class, Service Category and Production Category.</description>
      <pubDate>Mon, 07 Apr 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>FAT / SAT Protocols: Why Two Commissionings Matter</title>
      <link>https://structmod.com/blog/fat-sat-commissioning-protocols</link>
      <guid isPermaLink="true">https://structmod.com/blog/fat-sat-commissioning-protocols</guid>
      <description>Factory acceptance and site acceptance testing are not duplicated work — they are what keeps a modular project on schedule. A walk-through of our 142-point checklist.</description>
      <pubDate>Mon, 31 Mar 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Modular vs Container vs Trailer — Which to Choose?</title>
      <link>https://structmod.com/blog/modular-vs-container-vs-trailer</link>
      <guid isPermaLink="true">https://structmod.com/blog/modular-vs-container-vs-trailer</guid>
      <description>Three build systems, three transport envelopes, three deployment profiles. A side-by-side guide for architects and procurement teams choosing between modular, container and trailer.</description>
      <pubDate>Mon, 24 Mar 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>72-hour disaster response: what has to be pre-built</title>
      <link>https://structmod.com/blog/seventy-two-hour-disaster-response</link>
      <guid isPermaLink="true">https://structmod.com/blog/seventy-two-hour-disaster-response</guid>
      <description>If you are not holding stock, you are not responding. Lessons from Türkiye 2023, Morocco 2023 and Ukraine 2022–24 on what to keep on the yard and what cannot be built on demand.</description>
      <pubDate>Mon, 17 Mar 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Specifying a Level-2 field hospital in under two weeks</title>
      <link>https://structmod.com/blog/specifying-level-2-field-hospital</link>
      <guid isPermaLink="true">https://structmod.com/blog/specifying-level-2-field-hospital</guid>
      <description>A practical procurement checklist — bed count, surgical capability, sterile services, pharmacy, imaging, lab, utilities — for teams writing their first Level-2 hospital RFQ.</description>
      <pubDate>Mon, 10 Mar 2026 00:00:00 +0000</pubDate>
    </item>