GENEL BAKIŞ

Engineered once, deployable many times.

An expandable lab trailer is a road-deployable laboratory facility that opens to 7.5-8 m deployed width to accommodate full laboratory bench workspace, fume extraction infrastructure, biological safety cabinets and supporting laboratory equipment in a single trailer. structmod expandable lab trailers serve field research programmes (environmental sampling, ecological surveys, archaeological investigation), outbreak response (mobile diagnostic capability deploying to outbreak sites), industrial quality control at remote production sites, and clinical research programmes requiring on-site laboratory capability.

Standard configurations include modular laboratory benches with integrated services (gas, vacuum, water, electricity) along the trailer's length, fume cupboard (compliant with EN 14175) at one end, biological safety cabinet (Class II Type A2) for biological work, autoclave for sterilisation, refrigerated storage for samples and reagents, and supporting infrastructure (sample reception, hand wash, gowning area, dirty waste). BSL-2 configurations add anteroom for PPE workflow, HEPA-filtered exhaust, autoclave for waste sterilisation, and validated infection control workflow per BSL-2 requirements per WHO Laboratory Biosafety Manual.

structmod expandable lab trailers serve environmental investigation programmes (water quality testing at remote sites, soil contamination assessment), public health outbreak response (mobile diagnostic deployment to outbreak hot zones), academic and institutional research field campaigns, oil & gas operators requiring on-site quality control at exploration sites, and humanitarian deployment for clinical diagnostic capability in disaster zones. Lead time is 12-16 weeks from contract signature for stock configurations, 14-18 weeks for BSL-2 or specialty configurations. Compliance includes EN 14175 fume cupboards, ISO 15189 medical laboratory framework, WHO Laboratory Biosafety Manual reference.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2192

Toplam uzunluk15.2 m · 49.9 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)5.00 m
Yükseklik (nakliye)2,90 m
Zemin alanı (konuşlandırılmış)76.0 m²
Boş ağırlık14.2 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla genişleyebilir römork

WhatsApp ile sohbet