Engineered once, deployable many times.
An expandable office trailer is a road-deployable mobile office that opens to 7.5-8 m deployed width to accommodate full office workspace — workstations, meeting room, server closet, kitchenette and supporting facilities — in a single trailer that drives between deployment sites. structmod expandable office trailers serve construction project site offices needing weather-protected workspace for project teams, mining and oil & gas operations establishing field offices at exploration sites, event organisers running multi-event tours requiring consistent administrative capability, and disaster response coordinators establishing temporary command facilities.
Standard configurations provide approximately 60 m² of usable office floor area in deployed configuration, organised as 6-10 workstations in open or semi-private layout, one meeting room (typical 4-6 person capacity), server closet with rack space for IT equipment and structured cabling, kitchenette for staff refreshments, washroom with appropriate plumbing, and reception/visitor area at the trailer entrance. HVAC sized to office occupancy with appropriate fresh air provision, electrical infrastructure sized to office equipment load (typically 32A three-phase), structured cabling pre-installed for data and telephony, and lighting per office working environment standards.
structmod expandable office trailers serve sectors where road-deployable office capability matters — construction project camps (where the same trailer follows the project across multiple sites), mining and oil & gas exploration camps (rotating between exploration locations annually), mobile event coordination (corporate events, sporting tours, festival circuits), and disaster response coordination (deploying to event sites within hours of activation). Lead time is 8-12 weeks from contract signature. EN 1090 EXC-2 chassis construction, IEC 60364-1 commercial electrical, and DOT/E-mark vehicle homologation ensure regulatory compliance.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2509
| Toplam uzunluk | 14.9 m · 48.9 ft |
|---|---|
| Genişlik (nakliye) | 2,55 m |
| Genişlik (konuşlandırılmış) | 7.50 m |
| Yükseklik (nakliye) | 2.80 m |
| Zemin alanı (konuşlandırılmış) | 111.8 m² |
| Boş ağırlık | 16.9 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu |
| İklimlendirme | VRF çok bölmeli · HEPA H13 (tıbbi) |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 140 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 2–4 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.