
Engineered once, deployable many times.
An expandable operation trailer is a road-deployable surgical theatre that combines the floor area of a fixed-site operating theatre with the transport efficiency of a road trailer — deploying to 7.5-8 m wide operational footprint to accommodate the operating theatre, anaesthesia workstation, scrub bay, sterile preparation and recovery bay required for sustained surgical operation. structmod expandable operation trailers serve surgical outreach programmes (cataract surgery, hernia repair, cleft palate programmes), hospital surgical capacity during operating theatre refurbishment, military forward surgical capability requiring sustained deployment, and humanitarian surgical missions.
Standard configurations include the operating theatre (Class B environment per UK HBN 26-01 equivalent — typical 25-30 m² sterile field with HEPA H13 laminar flow ventilation), anaesthesia workstation with gas scavenging, scrub sink bay at theatre entrance, clean preparation zone, dirty instrument return, 1-2 bed recovery bay with monitoring, and supporting clinical spaces (medication preparation, sterile stock). Medical gas reticulation per ISO 9170 with cylinder-bank backup; medical electrical per IEC 60364-7-710 Group 2 with isolated power; pressure cascades maintain cleanliness across the deployed clinical environment.
structmod expandable operation trailers serve surgical missions where sustained operation justifies deployment time — cataract surgery outreach delivering 15-30 surgeries per day across multiple weeks, surgical workforce camp medical support, military forward surgical capability with ICU integration, and humanitarian surgical response in protracted crisis situations. Lead time is 14-18 weeks from contract signature for stock configurations, 18-22 weeks for specialty surgical configurations. Compliance includes IEC 60364-7-710 Group 2 medical electrical, ISO 14644 class 7 ultra-clean operating environment, microbiological commissioning before clinical use.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2866
| Toplam uzunluk | 14.6 m · 47.9 ft |
|---|---|
| Genişlik (nakliye) | 2,55 m |
| Genişlik (konuşlandırılmış) | 5.00 m |
| Yükseklik (nakliye) | 3.10 m |
| Zemin alanı (konuşlandırılmış) | 73.0 m² |
| Boş ağırlık | 13.6 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu |
| İklimlendirme | VRF çok bölmeli · HEPA H13 (tıbbi) |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 140 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 3 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.