Engineered once, deployable many times.
A mobile dialysis trailer brings haemodialysis capability to patient populations outside fixed renal unit catchments — rural areas with no local dialysis access, disaster response for patients with established renal failure, prison healthcare, workforce medical support in remote camps, and surge capacity during renal unit refurbishment. structmod mobile dialysis trailers accommodate 4-6 dialysis stations in parallel treatment workflow, with the water treatment and concentrate supply infrastructure that makes clinical dialysis possible — reverse osmosis plant, central bicarbonate supply, per-station acid concentrate, and dialysate distribution system.
Water treatment is the heart of a dialysis unit and the first engineering challenge on a mobile platform. structmod trailers integrate a full reverse osmosis water treatment plant dimensioned for the dialysis machine demand, with pre-filtration, softening, RO permeation, post-RO UV treatment, and delivery loop to each dialysis station. Water quality monitoring includes conductivity, chlorine, hardness, and microbiological surveillance per AAMI/ISO 23500 and EN 13959 standards. Central bicarbonate and acid concentrate supply feeds each station through a dedicated concentrate loop, eliminating the need for jug-at-machine concentrate handling and supporting reliable clinical dosing.
structmod mobile dialysis trailers serve national renal programmes running rural dialysis access, international development partners (WHO, UNHCR) supporting refugee populations with pre-existing renal failure, private renal care operators, and disaster response teams managing patients with chronic kidney disease in crisis settings. Lead time is 10-14 weeks from contract signature. Clinical commissioning includes water quality validation (AAMI/ISO 23500), machine-specific performance testing, and patient safety verification before first treatment.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2343
| Toplam uzunluk | 14.3 m · 46.9 ft |
|---|---|
| Genişlik (nakliye) | 2,99 m |
| Genişlik (konuşlandırılmış) | 2,99 m |
| Yükseklik (nakliye) | 3,00 m |
| Zemin alanı (konuşlandırılmış) | 42.8 m² |
| Boş ağırlık | 12.3 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 230 V / 50 Hz · TN-S · IEC 60364 uyumlu |
| İklimlendirme | Split inverter ısı pompası · MERV-8 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 130 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 5 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.