GENEL BAKIŞ

Engineered once, deployable many times.

A mobile emergency response trailer is a road-deployable incident command facility for civil protection authorities, fire and rescue services, and disaster response agencies — providing the operations centre, planning workspace, communications infrastructure and logistics staging that incident management requires. structmod mobile emergency response trailers serve civil protection agencies (AFAD in Türkiye, BBK in Germany, equivalent agencies elsewhere), fire and rescue services standing up incident command at major events, and disaster response programmes pre-positioning capability across earthquake or flood-prone areas.

Standard configurations follow the Incident Command System (ICS) workflow: incident operations centre with displays for the common operational picture, planning section workspace with map walls and information management, logistics section with equipment staging and supply tracking, finance/admin section, public information liaison space, command office for the incident commander, communications room with multi-band radio operator positions, and rest area for sustained operations. Inter-trailer coupling supports multiple trailers combining into larger emergency operations centres for major incidents (mass-casualty events, regional disasters, national emergencies).

structmod mobile emergency response trailers deploy with civil protection forces responding to disaster sites (earthquakes, floods, wildfires, industrial accidents), pre-positioned at strategic locations for rapid deployment when disasters occur, and used by major events (large concerts, sporting events, political summits) requiring temporary incident command capability. The 2023 Kahramanmaraş earthquakes demonstrated the value of pre-positioned modular emergency response capability. Lead time is 8-10 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical, integration with national civil protection radio networks.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3360

Toplam uzunluk12.0 m · 39.4 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)5.00 m
Yükseklik (nakliye)2.70 m
Zemin alanı (konuşlandırılmış)60.0 m²
Boş ağırlık12.0 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi2 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla mobil römork

WhatsApp ile sohbet