GENEL BAKIŞ

Engineered once, deployable many times.

A mobile event trailer is a road-deployable event support facility configured for festival operations, major sporting events, public assemblies, and large-scale event productions. structmod mobile event trailers serve event production companies running festival circuits across summer seasons, sports event promoters delivering events at multiple venues per year, corporate event operators running brand activations and major announcements, and entertainment industry operators producing concerts, tours and themed events.

Standard configurations include flexible interior spaces configured per event need: production office with workstations and meeting space (event production team coordination), hospitality space (VIP receptions, sponsor entertainment, talent green room), registration and credentialing (event participant check-in, badge printing, schedule distribution), media centre (press conference space, broadcast positions, press writing positions), event services (lost & found, accessibility services, first aid liaison), and supporting infrastructure (washrooms, kitchen facility for staff catering, equipment storage). Configuration flexibility allows the same trailer to serve different event functions across the season — production office at one festival, hospitality at the next, media centre at the third.

structmod mobile event trailers serve event operators where road-deployable event infrastructure follows the production schedule across multiple venues — festival circuits (summer music festivals, art festivals, food festivals), sports event circuits (golf, tennis, cycling tours, motorsport), corporate event tours (product launches across cities, brand activation tours), and entertainment tours (concert tours, themed entertainment events). Lead time is 8-10 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical, accessibility per ADA equivalent for event services.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2023

Toplam uzunluk14.3 m · 46.9 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)2.80 m
Zemin alanı (konuşlandırılmış)42.8 m²
Boş ağırlık16.3 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu
İklimlendirmeVRF çok bölmeli · HEPA H13 (tıbbi)
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı140 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi5 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla mobil römork

WhatsApp ile sohbet