Engineered once, deployable many times.
A mobile medical waste trailer is a road-deployable clinical waste treatment facility — autoclave for sterilisation of infectious waste, with closed-loop processing to prevent operator exposure during loading, treatment and discharge. structmod mobile medical waste trailers serve hospital networks managing waste streams across multiple sites without dedicated central treatment facility, military deployments where external waste contractor service is unavailable, humanitarian operations in disaster zones, and field hospital configurations where waste treatment must be self-contained.
Standard configurations include the autoclave (typical 200-500 kg capacity per cycle) integrated into the trailer with sealed loading bay protecting operators from infectious exposure, automated cycle control following EN 285 / ISO 17665 sterilisation parameters (typical 134°C for 18 minutes or equivalent dwell time), discharge bay for treated sterile waste suitable for municipal disposal stream, water and chemical supply for autoclave operation, supporting infrastructure (operator workstation, PPE storage, eyewash and emergency shower, cycle records storage), and onboard utilities (water tanks, generator) for autonomous operation where site utilities not available.
structmod mobile medical waste trailers serve hospital networks running internal waste treatment programmes (cost or sovereignty reasons for not using external contractors), military deployments standing up self-sufficient medical capability, humanitarian operations in disaster zones where waste infrastructure is destroyed, and specialty facilities (research, clinical trial sites, burns units) generating high-volume specialist waste streams. The trailer-based configuration supports rotating deployment between multiple sites within a hospital network, treating accumulated waste at each site before moving to the next. Lead time is 10-12 weeks from contract signature.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2789
| Toplam uzunluk | 14.9 m · 48.9 ft |
|---|---|
| Genişlik (nakliye) | 2,55 m |
| Genişlik (konuşlandırılmış) | 7.50 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 111.8 m² |
| Boş ağırlık | 17.9 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 2–4 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.