GENEL BAKIŞ

Engineered once, deployable many times.

A mobile office trailer is a road-deployable office workspace configured for project site administration, construction management, field operations, and temporary administrative needs. structmod mobile office trailers serve construction project site offices (where the office follows the project across multiple phases or locations), mining and oil & gas exploration teams requiring administrative capability at remote sites, infrastructure project management (utilities construction, road projects, large industrial builds), and emergency response coordination establishing temporary administrative infrastructure at disaster sites.

Standard configurations include 4-6 workstations (desks with ergonomic seating, network and power outlets), small meeting area (4-6 person capacity with appropriate AV for presentations), server closet with rack space for IT equipment and structured cabling, kitchenette for staff refreshments, washroom with appropriate plumbing, and reception/visitor area at the trailer entrance. HVAC sized to office occupancy with appropriate fresh air provision, electrical infrastructure sized to office equipment load (typically 16-32A single or three-phase), structured cabling pre-installed for data and telephony, and lighting per office working environment standards. The mobile configuration enables offices to deploy with the operational programme rather than requiring permanent office construction at each location.

structmod mobile office trailers serve sectors where road-deployable office capability matters — construction project camps (the same trailer follows the project across multiple phases), mining and oil & gas exploration (rotating between exploration locations), infrastructure projects (utilities, transport, energy development), and temporary corporate administrative needs. Lead time is 8-10 weeks from contract signature for stock configurations. EN 1090 EXC-2 chassis construction, IEC 60364-1 commercial electrical, DOT/E-mark vehicle homologation, and accessibility per ADA equivalent where applicable.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2097

Toplam uzunluk13.7 m · 44.9 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)7.50 m
Yükseklik (nakliye)3,00 m
Zemin alanı (konuşlandırılmış)102.8 m²
Boş ağırlık9.7 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

Daha fazla mobil römork

WhatsApp ile sohbet