Engineered once, deployable many times.
A mobile shower trailer is a road-deployable ablution facility configured with shower cubicles, hot water generation, HVAC and greywater treatment infrastructure pre-installed. structmod mobile shower trailers ship at standard trailer width (2.55 m) with 8 individual shower cubicles plus drying area, lockers and ancillary infrastructure — deploying in 2-4 hours at the camp or event site. The trailer-based configuration drives between deployment sites, supporting operations that follow workforce camps, event circuits, or humanitarian deployments.
Standard configurations include 8 shower cubicles (4 per side in the trailer's linear layout), each with thermostatic shower mixer, individual lighting, soap and shampoo dispenser mounting, towel hook, and drainage. Central drying area with benches and mirror positions supports post-shower towelling and dressing. Hot water is generated by central plant (typical 150-250 L tank capacity with continuous regeneration), with circulation loops maintaining temperature at fixtures. Ventilation extracts moisture from the shower zone (typical 15-20 air changes per hour) preventing mould growth. Greywater treatment includes oil/grit trap, pH adjustment, and optional package STP for compliance discharge — important where direct mains sewer discharge is unavailable.
structmod mobile shower trailers serve mining and oil & gas workforce camps (typical 1 shower per 8-12 occupants ratio), construction project camps, event sites (festivals, sporting events, political summits), military exercises and training deployments, and humanitarian deployments (refugee camps, disaster response staging). Lead time is 8-10 weeks from contract signature. EN 1090 EXC-2 chassis, DOT/E-mark vehicle homologation, IEC 60364-7-701 wet-area electrical for shower installation safety, and waste water management per environmental regulations at the deployment site.
Tipik Konuşlanma Sırası
- Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
- Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
- Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
- Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
- Saat 3–4 — FAT protokolüne göre işlevsel test
- Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
Spec sheet — STR-2141
| Toplam uzunluk | 14.1 m · 46.3 ft |
|---|---|
| Genişlik (nakliye) | 2,55 m |
| Genişlik (konuşlandırılmış) | 7.50 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 105.8 m² |
| Boş ağırlık | 17.1 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 3 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.