Engineered once, deployable many times.

A mobile training trailer is a road-deployable training and certification facility configured for industrial, vocational, professional or military training programmes at the workplace or field site. structmod mobile training trailers serve industrial safety training programmes (mining, oil & gas, construction, manufacturing) delivering certification at worksites, military training units conducting specialty courses at operating bases, professional certification programmes (medical, technical, regulatory) reaching practitioners at their locations, and vocational training programmes extending trade education to remote areas.

Standard configurations include classroom/theory space (typical 30-45 m² for 15-25 trainees with teacher position, whiteboard or smartboard, student seating in theatre or classroom layout), simulator/practical space (configured for the specific training topic — equipment simulator, procedure practice area, specialty training apparatus), instructor's workspace with course materials and assessment infrastructure, printer and paperwork area for certification documentation, and supporting infrastructure (climate control, appropriate lighting for training activities, washroom, kitchenette for breaks). Specialty configurations include welding training booths, vehicle operator simulators, medical procedure practice rooms, mining safety simulators, and other topic-specific training infrastructure.

structmod mobile training trailers serve organisations where on-site training delivery matters — reducing the overhead of trainee travel to central training centres, maintaining workforce availability by training on-site, and ensuring training relevance by delivering it in the working environment. Common use cases: mining safety certification campaigns visiting multiple sites annually, manufacturing compliance training across multi-site industrial operators, military specialty training reaching deployed units, professional continuing education for medical, engineering or technical practitioners. Lead time is 10-12 weeks from contract signature. EN 1090 EXC-2 chassis, IEC 60364-1 commercial electrical, specialty equipment integration per training topic.

Tipik Konuşlanma Sırası

  1. Saat 0 — römork çekici araçla gelir, konumlandırılır ve takoz vurulur
  2. Saat 0–1 — dengeleme krikoları açılır, tesviye doğrulanır
  3. Saat 1–2 — hidrolik duvarlar veya genişleme panelleri açılır
  4. Saat 2–3 — altyapı bağlantıları (elektrik, su, atık su)
  5. Saat 3–4 — FAT protokolüne göre işlevsel test
  6. Saat 4 — kullanıcı eğitimiyle operasyonel teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2337

Toplam uzunluk13.7 m · 44.9 ft
Genişlik (nakliye)2,55 m
Genişlik (konuşlandırılmış)7.50 m
Yükseklik (nakliye)3,00 m
Zemin alanı (konuşlandırılmış)102.8 m²
Boş ağırlık15.7 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.