GENEL BAKIŞ

Engineered once, deployable many times.

A modular medical clinic is a permanent-installation healthcare building assembled from volumetric prefabricated modules — complete rooms with finishes, MEP services and clinical fittings already installed in the factory. structmod modular medical clinics deliver primary-care, specialist outpatient or community-clinic capability with the design life and clinical performance of a conventional building, but with the construction schedule of a manufactured product. Site foundation works and module production run in parallel; modules arrive plumbed, wired and finished; on-site assembly takes days; commissioning takes weeks; the clinic opens in a fraction of conventional construction time.

Standard configurations include 2-6 examination rooms, consultation offices, a treatment bay for procedures, a clinical room for nursing and dressings, a phlebotomy or sample collection point, a small clinical laboratory, a pharmacy dispensary, reception and waiting area, staff rooms and washrooms, and patient washrooms. The modular grid allows specialty extensions — adding a dental wing, a women's health wing, a paediatric wing, or a minor surgery suite — by adding additional modules to the same architectural language. Infection control, MEP zoning, finishes and accessibility all match the brief of a national health ministry community clinic standard.

structmod modular medical clinics serve health ministries building rapid-deployment community health infrastructure, NGOs establishing semi-permanent primary care presence in underserved areas, mining and oil & gas operators establishing site clinics for workforce healthcare, and private healthcare chains opening new outpatient centres. Lead time is 8-14 weeks from contract signature for stock configurations, 12-18 weeks for customised clinical programmes. EN 1090 EXC-2 structural steel, IEC 60364-7-710 medical electrical, and destination-country building code compliance ensure regulatory readiness for permanent installation.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2747

Toplam uzunluk14.7 m · 48.2 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3.20 m
Zemin alanı (konuşlandırılmış)44.0 m²
Boş ağırlık11.7 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

More from healthcare

WhatsApp ile sohbet