GENEL BAKIŞ

Engineered once, deployable many times.

A modular dental clinic is a permanent-installation dental practice assembled from prefabricated modules with full clinical fittings, MEP services and dental infrastructure already installed. structmod modular dental clinics scale from 2-chair primary care dental practices through to 10+ chair specialty clinics with implant suites, oral surgery facilities and full prosthetic laboratories. The modular construction approach delivers the dental practice in 8-14 weeks turnkey, compared to 6-12 months for conventional construction — important for new practice openings, dental chain expansion programmes, and replacement of obsolete dental facilities.

Each dental chair in the clinic comes pre-installed with chairside infrastructure: dental delivery unit, suction, compressed air, water supply (mains and bottled water for critical procedures), overhead operatory light, x-ray sensor or film workflow, and chairside instrument storage. Central infrastructure includes the sterilisation suite (linear dirty-to-clean workflow with ultrasonic cleaning, autoclave, packaging), centralised dental compressor and suction units in the mechanical room, panoramic and cephalometric x-ray, dental laboratory for chairside prosthetics and minor lab work, and reception/waiting flow management. Larger configurations add cone-beam CT, sedation suite, oral surgery theatre and recovery, and specialty workflow zones.

structmod modular dental clinics serve dental practice chains opening new locations, dental schools establishing teaching clinics, military dental services standing up garrison dental support, corporate occupational dental programmes, and humanitarian dental services in semi-permanent deployment. Lead time is 8-14 weeks from contract signature for stock 4-chair configurations, 14-20 weeks for larger or specialty configurations. Compliance includes IEC 60364-7-710 medical electrical, infection control workflow per HTM 01-05 (UK) or equivalent national standard, and dental practice regulation compliance per destination country.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2104

Toplam uzunluk14.4 m · 47.2 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3.10 m
Zemin alanı (konuşlandırılmış)43.1 m²
Boş ağırlık16.4 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu
İklimlendirmeVRF çok bölmeli · HEPA H13 (tıbbi)
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı140 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresiSahada 2–7 gün

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.