GENEL BAKIŞ

Engineered once, deployable many times.

A modular emergency care hospital is a permanent emergency department wing built from prefabricated modules organised around the standard ED workflow — triage at entry, resuscitation bays for life-threatening presentations, treatment bays for urgent and standard cases, and a short-stay observation area for patients awaiting admission, discharge or transfer. structmod modular emergency care hospitals serve hospitals expanding ED capacity to meet rising patient volumes, replacing aging ED infrastructure during refurbishment, or building new emergency capability at hospitals or stand-alone urgent care centres. The 12-18 week turnkey delivery compresses the conventional 12-24 month ED construction timeline.

Standard configurations include the ambulance entrance with trolley reception, triage cubicles for initial clinical screening, 2-3 resuscitation bays equipped for cardiac arrest, major trauma and airway emergencies (full monitoring, defibrillation, airway management, ventilation, surgical airway capability), 8-16 treatment bays for urgent and standard presentations (examination couches with monitoring, IV access, medication trolleys), a short-stay observation ward (4-12 beds) for patients awaiting decision, supporting clinical spaces (clean and dirty utility, drug room, plaster room, paediatric assessment, mental health assessment cubicle) and ED-specific clinical workflow (POCUS access, x-ray imaging integration, lab sample transport, emergency medication automation).

structmod modular emergency care hospitals deliver to hospitals across Europe, the Gulf and Africa where ED capacity expansion is a priority, to national health programmes building urgent care capability, and to humanitarian agencies establishing emergency referral capacity in extended deployments. Lead time is 14-18 weeks from contract signature for stock configurations, 18-24 weeks for customised configurations including specialty ED capabilities (paediatric ED, mental health crisis service, infectious disease isolation). Clinical commissioning validates emergency workflow, monitoring, life-safety systems and infection control before clinical opening.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-3129

Toplam uzunluk12.9 m · 42.3 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3,00 m
Zemin alanı (konuşlandırılmış)38.6 m²
Boş ağırlık15.9 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresiSahada 2–7 gün

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.