Engineered once, deployable many times.
A modular hospitality room is a hotel-grade guest room delivered as a complete factory-finished volumetric module — bed, en-suite bathroom, wardrobe, work desk, climate control, lighting, and finishes already installed in the factory. structmod modular hospitality rooms serve hotel chains accelerating new-build programmes (Marriott Fairfield, Hilton Garden Inn, Holiday Inn Express, AC Hotel — all major brands now use modular construction for repeatable room formats), boutique hotel developers building distinctive properties on tight timelines, extended-stay operators expanding inventory, and resort developers building large room counts in remote or seasonal locations. Modular construction reduces hotel build time by up to 50% versus conventional construction.
Standard configurations follow hotel brand specifications. Typical room dimensions are 3-4 m wide × 6-8 m long × 2.8-3.2 m high — accommodating one queen or king bed plus en-suite bathroom (shower, toilet, basin) plus circulation. Larger configurations support two queen beds for family rooms, or single bed plus expanded work area for business hotels. Each room module arrives finished with brand-specified furniture, fixtures and equipment (FFE), connected MEP services (one connection point per side for power, water and drain), and tested ready for occupancy. On-site work is limited to lifting modules into position on the structural frame, connecting MEP services, and final corridor finishes — typical 3-6 month total construction for 100-200 room hotels.
structmod modular hospitality rooms support hotel development across European and Gulf markets where construction speed and cost certainty drive procurement decisions. Compared to conventional construction, modular typically delivers meaningful total project cost savings primarily through schedule reduction. Key brand-driven specifications include acoustic separation between rooms (typical STC 50-55 partition rating), fire compartmentation per hotel fire code, accessibility for ADA-equivalent hotel rooms, and energy performance per destination-country building code. Lead time is 12-16 weeks from contract signature for room module production at scale (50-200 modules per project).
Tipik Konuşlanma Sırası
- Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
- Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
- Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
- Gün 4–5 — MEP bağlantıları, ıslak testler
- Gün 5–6 — iç kaplama, armatür ve ekipman montajı
- Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
Spec sheet — STR-2501
| Toplam uzunluk | 14.1 m · 46.3 ft |
|---|---|
| Genişlik (nakliye) | 2,99 m |
| Genişlik (konuşlandırılmış) | 2,99 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 42.2 m² |
| Boş ağırlık | 17.1 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Sismik tasarım | EN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 3 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.