GENEL BAKIŞ

Engineered once, deployable many times.

A modular luxury room is a 5-star hotel suite delivered as a complete factory-finished volumetric module with the premium FFE specification, materials and finishes that luxury hospitality brands demand. structmod modular luxury rooms serve resort developers building premium properties on tight timelines, boutique hotel brands expanding portfolios, urban luxury hotel projects on constrained sites, and corporate-owned executive accommodation. The modular construction approach delivers the same luxury room finish as conventional construction at significantly faster build cadence — increasingly accepted by luxury brands as the construction method matures.

Luxury room specifications include premium materials (natural stone in bathrooms, hardwood furniture, premium fabrics, designer lighting), Italian or German bathroom fittings (Hansgrohe, Grohe, Villeroy & Boch, Duravit, Geberit), king-size beds with premium mattresses and linen, smart room controls (lighting scenes, climate, blackout blinds, entertainment, room service ordering), high-quality glazing with blackout capability and acoustic performance, and bespoke artwork and signature touches per the brand identity. Room dimensions typically scale up from standard hotel modules — 4-5 m wide × 8-10 m long × 3-3.5 m high accommodating king bed, sitting area, large en-suite bathroom with separate bathtub and shower, wardrobe area, and premium work/entertainment area.

structmod modular luxury rooms support luxury hotel and resort development globally — the increasing acceptance of modular construction by luxury brands (Four Seasons, Mandarin Oriental, Aman, Six Senses, Bulgari, premium Marriott and Hilton brands) reflects the demonstrated quality achievable through factory production. Lead time is 14-18 weeks from contract signature for production at scale; bespoke design elements add 4-8 weeks. All luxury room projects are quoted per specification after brand brief review and FFE selection.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-1988

Toplam uzunluk14.8 m · 48.6 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)2,90 m
Zemin alanı (konuşlandırılmış)44.3 m²
Boş ağırlık17.8 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu
İklimlendirmeÇatı üstü paket cihaz · MERV-13
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı150 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi5 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.