GENEL BAKIŞ

Engineered once, deployable many times.

A modular mammography clinic is a permanent breast screening facility built from prefabricated modules with the imaging rooms, lead shielding, image reading workstations, patient changing cubicles, counselling rooms and reception flow already integrated. structmod modular mammography clinics serve national breast cancer screening programmes building or expanding fixed screening capacity, hospital breast units replacing legacy mammography infrastructure, regional cancer centres establishing dedicated breast imaging capability, and private healthcare operators building breast screening services. The 10-14 week turnkey delivery accelerates screening programme rollout.

Standard configurations include 1-2 mammography rooms (lead-shielded per NCRP Report 147 with workload-adjusted shielding calculation), patient changing cubicles with secure storage, examination room for clinical breast examination, image reading room with PACS workstations and reporting infrastructure, counselling room for results communication and onward referral, reception and waiting area, and supporting clinical and administrative spaces. Tomosynthesis capability (digital breast tomosynthesis, DBT) is supported with the same shielding package; ultrasound rooms for diagnostic follow-up and stereotactic biopsy capability are added as configuration options for larger breast units.

structmod modular mammography clinics support national screening programmes (UK NHS Breast Screening Programme, Turkey Kanser Tarama Programı, similar programmes across Europe and the Gulf), regional cancer programmes building screening infrastructure, university hospital breast units, and private breast care providers. Lead time is 10-14 weeks from contract signature for stock configurations, 12-16 weeks for larger configurations including diagnostic and biopsy capability. Compliance includes IEC 60601-2-45 mammography equipment safety, NCRP Report 147 shielding, and EU Medical Exposures Directive.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2658

Toplam uzunluk13.8 m · 45.3 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)2.70 m
Zemin alanı (konuşlandırılmış)41.3 m²
Boş ağırlık12.8 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi5 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.

İLGİLİ ÜRÜNLER

More from healthcare

WhatsApp ile sohbet