GENEL BAKIŞ

Engineered once, deployable many times.

A modular military command unit is a deployable headquarters facility built from prefabricated modules with the workspaces, communications infrastructure and operational layout required for tactical command and control. structmod modular military command units serve at battalion, brigade or division level — providing the dedicated tactical operations centre (TOC), command operations centre (COC), or expeditionary headquarters that battlefield commanders need for situational awareness, decision-making and coordination across air, land, sea and cyber domains. The modular construction approach delivers a fully-fitted command facility in 10-14 weeks turnkey, then redeploys to new locations as the operational picture demands.

Standard configurations organise the command unit around the operational workflow: situation room with large-format displays for the common operational picture (COP), planning bays with workstations and map walls, briefing room sized for staff updates and command conferences, communications room with radio operator positions and equipment racks, command office for the commander and key staff, secure comms space (ready for cleared classified equipment installation), and supporting workspaces for intelligence, fires, logistics and personnel staff. C4ISR integration includes pre-installed cable trays, dedicated power circuits, EMI/EMC-protected enclosures for sensitive equipment, and grounding/bonding to military electrical standards.

structmod modular military command units serve NATO-aligned defence forces, allied nations operating in coalition environments, UN peacekeeping headquarters, and national defence forces standing up new tactical command capability. The modular approach is increasingly preferred over rigid containerised solutions for scenarios needing more workspace per deployed footprint, more visual line-of-sight for command teams, and more reconfiguration flexibility as operational tempo and unit structure change. NATO CAGE registration, STANAG-compliant interface specifications, and optional CBRN protection per STANAG 4447 support multinational deployment. Lead time is 10-14 weeks from contract signature for stock configurations, 12-16 weeks for security-classified configurations including TEMPEST shielding.

Tipik Konuşlanma Sırası

  1. Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
  2. Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
  3. Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
  4. Gün 4–5 — MEP bağlantıları, ıslak testler
  5. Gün 5–6 — iç kaplama, armatür ve ekipman montajı
  6. Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2949

Toplam uzunluk14.9 m · 48.9 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3,00 m
Zemin alanı (konuşlandırılmış)44.6 m²
Boş ağırlık15.9 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2
Kaynak kalitesiEN ISO 3834-3
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı230 V / 50 Hz · TN-S · IEC 60364 uyumlu
İklimlendirmeSplit inverter ısı pompası · MERV-8
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı130 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresiSahada 2–7 gün

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.