Engineered once, deployable many times.
A modular multi-clinic is a permanent multi-specialty outpatient clinic — combining primary care, specialty consultation rooms, diagnostic services and supporting clinical infrastructure in a single integrated facility. structmod modular multi-clinics serve as community polyclinics, district health centres or specialty consultation hubs — delivering broad clinical capability close to the patient population without the cost and complexity of a full hospital build. The modular construction approach delivers a 6-12 specialty multi-clinic in 12-16 weeks turnkey, compared to 12-24 months for conventional polyclinic construction.
Standard configurations organise the clinic around a shared central core (reception, waiting, records, pharmacy, basic diagnostics) with specialty consultation wings radiating outward. Typical specialty mix includes general practice (4-8 examination rooms), women's health (gynaecology, antenatal, family planning), paediatric (well-child, immunisation, sick child), dental (2-4 chairs), ophthalmology (examination, refraction, minor procedures), ENT (consultation, audiology), dermatology (consultation, minor procedures), mental health (consultation, counselling), and physiotherapy (treatment area, exercise space). Diagnostic services include x-ray, ultrasound, ECG, point-of-care laboratory, and pharmacy dispensing.
structmod modular multi-clinics deliver to national health ministries building community health infrastructure (the WHO Astana Declaration's primary healthcare model), to district hospital networks extending outpatient capacity to underserved areas, to private healthcare chains opening community polyclinics, and to large employers providing comprehensive workforce healthcare. Lead time is 12-16 weeks from contract signature for stock 6-specialty configurations, 14-18 weeks for larger or customised configurations. Compliance covers IEC 60364-7-710 medical electrical, infection control per national standard, and ministry-of-health departmental requirements per destination country.
Tipik Konuşlanma Sırası
- Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
- Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
- Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
- Gün 4–5 — MEP bağlantıları, ıslak testler
- Gün 5–6 — iç kaplama, armatür ve ekipman montajı
- Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
Spec sheet — STR-2027
| Toplam uzunluk | 14.7 m · 48.2 ft |
|---|---|
| Genişlik (nakliye) | 2,99 m |
| Genişlik (konuşlandırılmış) | 2,99 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 44.0 m² |
| Boş ağırlık | 11.7 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Sismik tasarım | EN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 4 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.