Engineered once, deployable many times.
A modular ophthalmology clinic is a permanent eye care facility built from prefabricated modules with the examination lanes, laser treatment rooms, ophthalmic operating theatre, recovery and pharmacy infrastructure already integrated. structmod modular ophthalmology clinics serve specialty eye hospitals scaling cataract surgery capacity, regional eye care programmes building dedicated infrastructure, university teaching eye hospitals, and humanitarian eye care programmes (Orbis, Sightsavers, CBM-supported) establishing semi-permanent presence. The 12-16 week turnkey delivery accelerates clinical opening compared to 12-24 month conventional builds.
Standard configurations organise the eye clinic around the patient pathway: arrival and visual acuity assessment in the entry zone; examination lanes (typically 4-8) for refraction, slit-lamp biomicroscopy, fundus examination and supplementary testing (OCT, visual fields, corneal topography); diagnostic imaging room (fundus camera, fluorescein angiography); laser treatment rooms for retinal photocoagulation, YAG capsulotomy and SLT glaucoma treatment; ophthalmic operating theatre with operating microscope, phacoemulsification capability, vitrectomy capability where specified; recovery bay with monitored seats; and supporting clinical and administrative infrastructure including dedicated ophthalmic pharmacy.
structmod modular ophthalmology clinics deliver to national cataract programmes (clearing surgical waiting lists in countries with significant cataract blindness burden), to private eye hospital chains opening new locations, to international NGOs running eye care programmes, and to academic ophthalmology departments establishing teaching infrastructure. Lead time is 12-16 weeks from contract signature for stock configurations, 16-20 weeks for full eye hospital configurations including vitrectomy and corneal surgery capability. Compliance includes IEC 60364-7-710 medical electrical, ophthalmic device regulation per destination country, and infection control per national surgical standards.
Tipik Konuşlanma Sırası
- Gün 1 — saha temeli doğrulandı, vida krikoları veya şerit temel yerleştirildi
- Gün 2–3 — modüller mobil vinçle konumuna yerleştirildi
- Gün 3–4 — modüller arası bağlantılar ve zarf sızdırmazlığı
- Gün 4–5 — MEP bağlantıları, ıslak testler
- Gün 5–6 — iç kaplama, armatür ve ekipman montajı
- Gün 7 — devreye alma, FAT raporu, kullanıcı eğitimi ve teslimat
Spec sheet — STR-4727
| Toplam uzunluk | 12.7 m · 41.7 ft |
|---|---|
| Genişlik (nakliye) | 2,99 m |
| Genişlik (konuşlandırılmış) | 2,99 m |
| Yükseklik (nakliye) | 3.20 m |
| Zemin alanı (konuşlandırılmış) | 38.0 m² |
| Boş ağırlık | 11.7 t |
| Şasi | EN 10025 S355JR sıcak hadde çelik · EN 1090 EXC-2 |
| Kaynak kalitesi | EN ISO 3834-3 |
| Zarf | Sandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K) |
| Yangın direnci | EI-30 · EN 13501-2'ye göre test edilmiş |
| Zemin | EPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı |
| Elektrik tesisatı | 120/240 V · 60 Hz (ABD spec) · IEC 60364 uyumlu |
| İklimlendirme | Çatı üstü paket cihaz · MERV-13 |
| Çalışma aralığı | −25 °C ile +50 °C ortam |
| Rüzgar sınıfı | 150 km/s temel rüzgar için tasarlandı (EN 1991-1-4) |
| Sismik tasarım | EN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM |
| Nakliye | ISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar) |
| Kurulum süresi | 4 saat · 2 kişilik ekip |
Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.