GENEL BAKIŞ

Engineered once, deployable many times.

A multi-storey modular hospital is a 3-6 storey healthcare facility assembled from volumetric prefabricated modules on a primary structural steel frame. This construction approach is the standard solution for mid-size urban hospitals where site footprint is limited, permanent construction is required, and the project timeline must compress the conventional 30-48 month hospital construction schedule into 12-18 months. structmod multi-storey modular hospitals deliver on all three constraints without compromising clinical performance, lifecycle durability, or compliance with ministry-of-health standards.

The typical layout places high-dependency clinical functions — emergency, surgery, ICU, imaging, sterile services — on the ground and first floors for fastest access and heaviest services demand. Ward floors occupy storeys 2-5 with wings radiating from a central service core housing lifts, stairs, MEP risers, and staff circulation. A rooftop plant deck carries HVAC, water tanks, solar, medical gas reticulation and helicopter landing pad where specified. The primary structural steel frame is erected site-first, modules infill the frame over 8-16 weeks, and finishes plus commissioning complete the final 4-6 months.

structmod delivers multi-storey modular hospitals to national health ministries, university teaching hospitals, private healthcare chains and international development partners. Completed projects include a 6-storey / 340-module / 120-bed regional referral hospital in northern Iraq, a 4-storey / 80-bed maternity and paediatric hospital in East Africa, and a 5-storey / 200-bed expansion wing integrated into an existing tertiary hospital campus. Each project is engineered to destination country building codes, Eurocode 8 seismic, fire compartmentation per EN 13501, and medical electrical per IEC 60364-7-710.

Tipik Konuşlanma Sırası

  1. Ay 1 — saha hazırlığı, temel çalışmaları, altyapı hendekleri
  2. Ay 2–3 — ana çelik taşıyıcı montajı (EN 1090)
  3. Ay 3–5 — zarf kapatma, çatı, perde duvar
  4. Ay 5–7 — MEP kaba tesisatı, tıbbi gaz, acil güç
  5. Ay 7–10 — iç donanım, ekipman kurulumu
  6. Ay 10–12 — devreye alma, FAT/SAT, kullanıcı eğitimi
  7. Ay 12 — tam İ&B dosyasıyla klinik teslimat
TEKNİK ÖZELLİKLER

Spec sheet — STR-2992

Toplam uzunluk15.2 m · 49.9 ft
Genişlik (nakliye)2,99 m
Genişlik (konuşlandırılmış)2,99 m
Yükseklik (nakliye)3.10 m
Zemin alanı (konuşlandırılmış)45.4 m²
Boş ağırlık13.2 t
ŞasiEN 10025 S355JR sıcak hadde çelik · EN 1090
Kaynak kalitesiEN ISO 3834-2 · sertifikalı kaynak koordinatörü (IWE)
ZarfSandviç panel, PIR çekirdek 80 mm · λ ≈ 0,023 W/(m·K)
Yangın direnciEI-30 · EN 13501-2'ye göre test edilmiş
ZeminEPDM üzerine denizcilik kontrplak · R-10 kayma sınıfı
Elektrik tesisatı400 V / 50 Hz · 3 fazlı · IEC 60364 uyumlu
İklimlendirmeVRF çok bölmeli · HEPA H13 (tıbbi)
Çalışma aralığı−25 °C ile +50 °C ortam
Rüzgar sınıfı140 km/s temel rüzgar için tasarlandı (EN 1991-1-4)
Sismik tasarımEN 1998-1 (Eurokod 8) uyarınca · sünek sınıf DCM
NakliyeISO 668 ayak izi · CSC plakası uygun (konteyner varyantlar)
Kurulum süresi4 saat · 2 kişilik ekip

Tam çizimler, hesap notları, DoP, İ&B kılavuzu ve FAT raporu her ünite ile dahildir. Özellikler gösterge niteliğindedir — proje gereksinimlerine göre yapılandırılabilir.